Laserfiche WebLink
19255517888 Main Fax GFTTLFR RYAN INC 0 ' 14 p m 12-05-2006 3/3 <br /> SWRCB,January 2002 Page?' of -L- <br /> 9. <br /> 9. SPILL/OVERFILL CONTAINMENTBOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested -- — <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: tle.Qa.s re, Equipment Resolution: <br /> g Spill Box# , Spill Box# Spill Box# Spill Box# <br /> rBucket <br /> ameter: 7 <br /> pth: 1 ' <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: 1-% <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: L 3 y <br /> Final Reading(RF): <br /> Test Duration: / <br /> Change in Reading(RrR,): <br /> Pass/Fail Threshold or � <br /> Criteria: <br /> 'e9t_ReStittf`.. . ._ ,' ; tws <. )t!tu ', ' Pa ' '> a ''. - L ,_Pa;.ak" .. <. 1E"asit<, Tr Fait;.''' <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />