Laserfiche WebLink
SWRCB..lanuar\ 2002 Page 2. <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: ❑ <br /> Spill/Overfill Containment Boxes are Present,but\\cre Not bested: El F <br /> Test Method Developed By: Spill Bucket Manufacturer a Industry Standard Professional Engineer <br /> ❑ Other(Specify) <br /> I est Method Used: ❑ Pressure F-1 Vacuum ❑X Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 1 REG FILL Spill Box# 1 REG FILL Spill Box# 2 REG FILL Spill Box# 3 PRE FILL <br /> Bucket Diameter: 12 12 13 13 <br /> Bucket Depth: 12 12 12 12 <br /> Wait time between applying <br /> pressure/vacuum/water and 5 5 5 5 <br /> starting test: <br /> Test Start Time: 0900 0900 0900 0900 <br /> Initial Reading(RI ): 8.50 8.50 8.50 9 <br /> Test End Time: 1000 1000 1000 0915 <br /> Final Reading(RF ): 8.50 8.50 8.50 8.50 <br /> Test Duration: 60 MINS. 60 MINS. 60 MINS. 15 MINS. <br /> Change in Reading(R 1:-RI ) 0 0 0 0.50 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: El Pass El Fail IZI Pass D Fail IZI Pass El Fail ElPass El Fail <br /> Comments- (include in formation on repairs made prior to testing, and reconiiiiended follow-up for failed tests) <br />