My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
3310
>
2800 - Aboveground Petroleum Storage Program
>
PR0528487
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2019 4:31:40 PM
Creation date
3/27/2019 8:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0528487
PE
2832
FACILITY_ID
FA0009490
FACILITY_NAME
KENTS OIL SVC INC
STREET_NUMBER
3310
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14339005
CURRENT_STATUS
01
SITE_LOCATION
3310 E MINER AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPCC TIER II QUALIFIED FACILITY APPLICABILITY-40 CFR 112.3(g)(2) <br /> The aggregate aboveground ail storage capacity is 10,000 U.S. gallons or less AND ®Yes E]No <br /> In the three years prior to the SPCC Plan self-certification date, or since becoming subject to the rule (if the <br /> facility has been in operation for less than three years), the facility has NOT had: <br /> • A single discharge as described in§112.1(b)exceeding 1,000 U.S. gallons, OR E]Yes ®No <br /> • Two discharges as described in§112.1(b)each exceeding 42 U.S.gallons within any twelve-month period' E]Yes ®No <br /> ABOVE,IF YES TO ALL OF THE r FACILITY 2 <br /> SEE ATTACHMENT D FOR TIER 11 QUALIFIED FACILITY CHECKLIST <br /> REQUIREMENTS FOR PREPARATION AND IMPLEMENTATION OF A SPCC PLAN-40 CFR 112.3 <br /> Date facility began operations: 1987 (AS KENTS OIL SVCS) <br /> Date of initial SPCC Plan preparation: (PREY.) 2014 Current Plan version(date/number): OCTOBER 15, 2018 <br /> 112.3(a) For facilities(except farms), including mobile or portable facilities: <br /> • In operation on or prior to November 10, 2011: Plan prepared and/or amended and fully []Yes [:]No ONA <br /> implemented by November 10,2011 <br /> • Beginning operations after November 10, 2011, Plan prepared and fully implemented QYes E]No [DNA <br /> before beginning operations <br /> For farms(as defined in§112.2): <br /> • In operation on or prior to August 16, 2002: Plan maintained,amended and FlYes QNo [DNA <br /> implemented by May 10, 2013 <br /> • Beginning operations after August 16, 2002 through May 10, 2013: Plan prepared and QYes E]No EINA <br /> fully implemented by May 10, 2013 <br /> • Beginning operations after May 10, 2013: Plan prepared and fully implemented before []Yes DNo EINA <br /> beginning operations <br /> 112.3(d) Plan is certified by a registered Professional Engineer(PE)and includes statements that the Yes [:]No DNA <br /> PE attests: <br /> PE is familiarwith the requirements of 40 CFR part 112 DYes oNo DNA <br /> • PE or agent has visited and examined the facility ' Yes D No DNA <br /> • Plan is prepared in accordance with good engineering practice including consideration []Yes M No DNA <br /> of applicable industry standards and the requirements of 40 CFR part 112 <br /> Procedures for required inspections and testing have been establishedLJYes [:]No [INA <br /> Plan is adequate for the facility QYes DNo DNA <br /> PE Name: OX. BARBER License No.: 21210 State: CA Date of certification: 10/10/2018 <br /> 112.3(e)(1) Plan is available onsite if attended at least 4 hours per day. If facility is unattended, Plan is ]Yes DNo []NA <br /> available at the nearest field office. <br /> (Please note nearest field office contact information in comments section below.) <br /> Comments: <br /> Oil discharges that result from natural disasters,acts of war,or terrorism are not included in this determination.The gallon amount(s)specified(either <br /> 1,000 or 42)refers to the amount of oil that actually reaches navigable waters or adjoining shorelines not the total amount of oil spilled.The entire <br /> volume of the discharge is oil for this determination. <br /> 2 An ownerloperator who self-certifies a Tier fl SPCC Plan may include environmentally equivalent alternatives and/or secondary containment <br /> impracticability determinations when reviewed and certified by a PE. <br /> Onshore Facilities(Excluding Oil Production) Page 4 of 14 June 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.