My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
3310
>
2800 - Aboveground Petroleum Storage Program
>
PR0528487
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2019 4:31:40 PM
Creation date
3/27/2019 8:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0528487
PE
2832
FACILITY_ID
FA0009490
FACILITY_NAME
KENTS OIL SVC INC
STREET_NUMBER
3310
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14339005
CURRENT_STATUS
01
SITE_LOCATION
3310 E MINER AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLAN FIELD <br /> 112.7(a)(3) Plan describes physical layout of facility and includes a diagram' QYes QNo QYes ONo <br /> that identifies: <br /> • Location and contents of all regulated fixed oil storage containers <br /> • Storage areas where mobile or portable containers are located <br /> • Completely buried tanks otherwise exempt from the SPCC requirements <br /> (marked as"exempt") <br /> • Transfer stations <br /> • Connecting pipes,including intra-facility gathering lines that are <br /> otherwise exempt from the requirements of this part under§112.1(d)(11) <br /> Plan addresses each of the following: <br /> (i) For each fixed container, type of oil and storage capacity(see []Yes [-]No QYes QNo <br /> Attachment A of this checklist). For mobile or portable containers, <br /> type of oil and storage capacity for each container or an estimate of <br /> the potential number of mobile or portable containers, the types of <br /> oil, and anticipated storage capacities <br /> (ii) Discharge prevention measures, including procedures for routineYes []NOQYes E]No <br /> handling of products(loading, unloading, and facility transfers, etc.) <br /> (iii) Discharge or drainage controls, such as secondary containment Yes QNo ElYes EJNo <br /> around containers, and other structures, equipment, and procedures <br /> for the control of a discharge <br /> (iv) Countermeasures for discharge discovery, response, and cleanup QYes []No QYes E]No <br /> (both facility's and contractor's resources) <br /> (v) Methods of disposal of recovered materials in accordance with QYes [:]No <br /> applicable legal requirements <br /> (vi) Contact list and phone numbers for the facility response coordinator, ]Yes []No <br /> National Response Center, cleanup contractors with an agreement <br /> for response, and all Federal, State, and local agencies who must <br /> be contacted in the case of a discharge as described in §112,1(b) <br /> 112.7(a)(4) Does not apply if the facility has submitted an FRP under§112.20.- []Yes QNo QNA <br /> Pian includes information and procedures that enable a person reporting <br /> an oil discharge as described in §112.1(b)to relate information on the: <br /> • Exact address or location and phone . Description of all affected media; <br /> number of the facility; • Cause of the discharge; <br /> • Date and time of the discharge; • Damages or injuries caused by the discharge; <br /> ■ Type of material discharged; . Actions being used to stop,remove,and <br /> • Estimates of the total quantity discharged; mitigate the effects of the discharge; <br /> • Estimates of the quantity discharged as . Whether an evacuation may be needed;and <br /> described in§112.1(b); • Names of individuals and/or organizations who <br /> • Source of the discharge; have also been contacted. <br /> 112.7(a)(5) Does not apply if the facility has submitted a FRP under§112.20: ]Yes 0 No ENA <br /> Plan organized so that portions describing procedures to be used <br /> when a discharge occurs wid be readily usable in an emergency <br /> 112.7(b) Plan includes a prediction of the direction, rate of flow, and total •QYes [:]No [:INA <br /> quantity of oil that could be discharged for each type of major <br /> equipment failure where experience indicates a reasonable potential <br /> for equipment failure <br /> Comments: <br /> 112.7(x) - CONNECTING PIPES NOT INCLUDED ON DIAGRAM. ONE HORIZONTAL TANK MISSING IN TANK FARM. <br /> 112.7(a)(3)(i) - TWO TANKS (22,23) VARIOUSLY IDENTIFIED AS 54,600 GALLONS AND 56,400 GALLONS IN PLAN <br /> 112.7(a)(3)(vi) - NATIONAL RESPONSE CENTER IS OPERATED BY U.S. COAST GUARD, NOT U.S. EPA <br /> 7 Note in comments any discrepancies between the facility diagram,the description of the physical layout of facility,and what is observed in the field <br /> Onshore Facilities(Excluding Oil Production) Page 7 of 14 June 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.