Laserfiche WebLink
PLAN FIELD <br /> 112.7(a)(3) Plan describes physical layout of facility and includes a diagram' QYes QNo QYes ONo <br /> that identifies: <br /> • Location and contents of all regulated fixed oil storage containers <br /> • Storage areas where mobile or portable containers are located <br /> • Completely buried tanks otherwise exempt from the SPCC requirements <br /> (marked as"exempt") <br /> • Transfer stations <br /> • Connecting pipes,including intra-facility gathering lines that are <br /> otherwise exempt from the requirements of this part under§112.1(d)(11) <br /> Plan addresses each of the following: <br /> (i) For each fixed container, type of oil and storage capacity(see []Yes [-]No QYes QNo <br /> Attachment A of this checklist). For mobile or portable containers, <br /> type of oil and storage capacity for each container or an estimate of <br /> the potential number of mobile or portable containers, the types of <br /> oil, and anticipated storage capacities <br /> (ii) Discharge prevention measures, including procedures for routineYes []NOQYes E]No <br /> handling of products(loading, unloading, and facility transfers, etc.) <br /> (iii) Discharge or drainage controls, such as secondary containment Yes QNo ElYes EJNo <br /> around containers, and other structures, equipment, and procedures <br /> for the control of a discharge <br /> (iv) Countermeasures for discharge discovery, response, and cleanup QYes []No QYes E]No <br /> (both facility's and contractor's resources) <br /> (v) Methods of disposal of recovered materials in accordance with QYes [:]No <br /> applicable legal requirements <br /> (vi) Contact list and phone numbers for the facility response coordinator, ]Yes []No <br /> National Response Center, cleanup contractors with an agreement <br /> for response, and all Federal, State, and local agencies who must <br /> be contacted in the case of a discharge as described in §112,1(b) <br /> 112.7(a)(4) Does not apply if the facility has submitted an FRP under§112.20.- []Yes QNo QNA <br /> Pian includes information and procedures that enable a person reporting <br /> an oil discharge as described in §112.1(b)to relate information on the: <br /> • Exact address or location and phone . Description of all affected media; <br /> number of the facility; • Cause of the discharge; <br /> • Date and time of the discharge; • Damages or injuries caused by the discharge; <br /> ■ Type of material discharged; . Actions being used to stop,remove,and <br /> • Estimates of the total quantity discharged; mitigate the effects of the discharge; <br /> • Estimates of the quantity discharged as . Whether an evacuation may be needed;and <br /> described in§112.1(b); • Names of individuals and/or organizations who <br /> • Source of the discharge; have also been contacted. <br /> 112.7(a)(5) Does not apply if the facility has submitted a FRP under§112.20: ]Yes 0 No ENA <br /> Plan organized so that portions describing procedures to be used <br /> when a discharge occurs wid be readily usable in an emergency <br /> 112.7(b) Plan includes a prediction of the direction, rate of flow, and total •QYes [:]No [:INA <br /> quantity of oil that could be discharged for each type of major <br /> equipment failure where experience indicates a reasonable potential <br /> for equipment failure <br /> Comments: <br /> 112.7(x) - CONNECTING PIPES NOT INCLUDED ON DIAGRAM. ONE HORIZONTAL TANK MISSING IN TANK FARM. <br /> 112.7(a)(3)(i) - TWO TANKS (22,23) VARIOUSLY IDENTIFIED AS 54,600 GALLONS AND 56,400 GALLONS IN PLAN <br /> 112.7(a)(3)(vi) - NATIONAL RESPONSE CENTER IS OPERATED BY U.S. COAST GUARD, NOT U.S. EPA <br /> 7 Note in comments any discrepancies between the facility diagram,the description of the physical layout of facility,and what is observed in the field <br /> Onshore Facilities(Excluding Oil Production) Page 7 of 14 June 2014 <br />