Laserfiche WebLink
ATTACHMENT A: SPCC FIELD INSPECTION AND PLAN REVIEW TABLE (CONT.) <br /> Documentation of Field Observations for Containers and Associated Requirements <br /> Container IDI General <br /> Condition 17 Storage Capacity and Type Type of Containment/ Overfill Protection and <br /> Aboveground or Buried Tank of Oil Drainage Control Testing&Inspections <br /> TANK 14, TANK 15 840,000 GALLONS EA WALLED CONTAINMENT <br /> PG BITUMEN ASPHALT & RETENTION PONDS <br /> TANK16, TANK 19 1,680,000 GALLONS EA WALLED CONTAINMENT <br /> PG BITUMEN ASPHALT & RETENTION PONDS <br /> TANK 18 2,520,000 GALLONS WALLED CONTAINMENT <br /> PG BITUMEN ASPHALT & RETENTION PONDS <br /> TANK 20 210,000 GALLONS WALLED CONTAINMENT <br /> PM ASPHALT & RETENTION PONDS <br /> TANK 21 451,000 GALLONS WALLED CONTAINMENT <br /> PM ASPHALT & RETENTION PONDS <br /> TANKS 22,23 56,400? GALLONS EA WALLED CONTAINMENT <br /> PM ASPHALT & RETENTION PONDS <br /> TANKS L1,L2 30,000 GALLONS EA WALLED CONTAINMENT <br /> ASPHALT & RETENTION PONDS <br /> TANKS C2.C3 6.000 GALLONS EA <br /> EMULSIFIER <br /> S-1 DRUMS, 5 EA 55 GALLONS EA <br /> HEAT TRANSFER OIL <br /> TANK RD1; TANK RD2 12,000 GAL; 2,100 GAL DW CONTAINERS AND <br /> DIESEL, RED DIESEL CONCRETE BASIN <br /> CONTAINERS H-1 TO H-4 1000 GALLONS EA RETENTION PONDS <br /> HEAT TRANSFER OIL <br /> S1.S2,S6,S8 DRUMS; 55 GALS; 275 GALS SPILL PALLETS <br /> S3,S4,S7 TOTES VARIOUS OILS CONTAINMENT BINS <br /> T1, T2 TRANSFORMERS — 175 GALLONS EA CLOSED SYSTEMS AND <br /> TRANSFORMER OIL ACTIVE CONTAINMENT <br /> 17 Identify each tank with either an A to indicate aboveground or B for completely buried <br /> Onshore Facilities(Excluding Oil Production) Page A-2 of 2 June 2014 <br />