My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2010 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2022 4:35:27 PM
Creation date
3/28/2019 8:40:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2012
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sigov.org/ehd/unitiii.htmi <br /> CONTINUATION FORM Page: 3 of 3 <br /> OFFICIAL INSPECTION REPORT Date: 02/22/11 <br /> Facility Address: 3212 N California Street, Stockton Program: UST <br /> SUMMARY OF VIOLATIONS <br /> CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Routine and Monitoring System Certification Underground Storage Tank Inspection <br /> 5. The monitoring plan on site is not approved by the San Joaquin County Environmental Health <br /> Department (EHD). The monitoring plan must be current and approved by the EHD. Add the tank <br /> overfill prevention method in the comments section of the monitoring plan. The current overfill <br /> prevention method is external audio / visual alarm set at 90% of tank capacity. Complete and submit a <br /> copy of the monitoring plan for approval by the EHD by March 22, 2011. An approved copy will be <br /> returned for your records. <br /> 24. Annual line leak detector testing was performed on March 3, 2010 and a test report has not been <br /> submitted to the EHD. A copy of the test report must be submitted within 30 days of the tests. <br /> Immediately submit a copy of the test report to the EHD. <br /> Note <br /> 1. Complete and submit a copy of the Return to Compliance Certification form with a statement of how <br /> each violation was corrected, including supporting documentation, by March 22, 2011. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE($122). <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Ins r: Received By: Title: <br /> v <br /> EHD 23- -003 Rev 08/10/10 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.