Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equip ed With SpilUOverfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:ELLDS Equipment Resolution 0007 <br /> Xgalat'�;•;$uar...,.�..x. �' .. -- r,• ate-,- �, -N. o <br /> 7 Spill Bog#f� g�/ SPM Box#ve '9/ Spill Bog# Y Spill Boz# <br /> Bucket Diameter <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test: <br /> Test Start Time: Z :c :7-7. <br /> Initial Reading(R�: . 7 G&7 V-7V <br /> Test End Time: 1 1: 1917- . Z= ! `- <br /> Final heading(RF): -4.'7 t 7J' Y. 7 V1.3- I• 2 1,12 811.-Z 5 YZ /, L 1. a <br /> Test Duration: 15 mi iutes 15 utes 15 mh kutes 15 minutes <br /> Change in heading(RF-R): ,p a c>'2 9 .00/00 _ o p I! <br /> .ba D/S .t30 2 S .RDOG <br /> Pass/Fail Threshold or 0.0020 0.0020 0.0020 0.0020 <br /> Criteria: <br /> Test Result: I&Pass ❑Fail Pass ❑Fail A Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing•,and recommendedfaflow-upforfaded tests <br /> Arco#02186 <br /> 321.2 N California <br /> Stockton,Ca <br /> Nick Harvey <br /> #10072 SB 989 <br /> i <br /> C l� <br />