Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YESX,I NO [] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> f P)CACr i CO3 JC W C,CY' Gc fE' <br /> 14\slyxj l oeu.=,1 b_yM- i2,i <br /> -VeA-X�cIX g I v a Poi- c <br /> P L U <br /> CA 0- <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-pa y approval): <br /> r I - - lZ bol <br /> ro oc1L@ - 2 v 11- <br /> 2 <br />