Laserfiche WebLink
Monitoring System Certification <br /> F. In-Tank Gauging/SIR Equipment: [Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> larlyes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> es ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> EF'Yes ❑ No* Was accuracy of system product level readings tested? <br /> iT Yes ❑ No* Was accuracy of system water level readings tested? <br /> Yes ❑ No* Were all probes reinstalled properly? <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Com tete the followin2 checklist: <br /> Yes 1 ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: 0_3-g.p.h.; ❑0.1 g.p.h; [10.2 g.p.h. <br /> Yes O No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> es O No* Was the testing apparatus properly calibrated? <br /> ❑ Yes O No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> O N/A <br /> Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> Yes O No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ N/A or fails a test? <br /> Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: !3 l TzT Smv-; OCC-L/kov ..✓ d22&7)( ?—S— 5-5--Go—tys <br /> A 7- oU-- S'tfr�T .,�✓ ©ec�,[c� i-+ ,�P, ,2 3 Sc�o.✓Ds. <br /> Page 3 of 3 <br />