Laserfiche WebLink
SWRCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: Arco AmPm#2186 Date of Testing: 5/22/09 <br /> Facility Address: 3212 N.California St., Stockton Ca <br /> Facility Contact: Kevin Vo Phone: (209)941-2694 <br /> Date Local Agency Was Notified of Testing <br /> Name of Local Agency Inspector(ifpresent during testing): <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: Gettler-Ryan Inc. <br /> Technician Conducting Test: Pete Garcia 5300833-UT <br /> Credentials': ❑CSLB Contractor X ICC Service Tech. ❑SWRCB Tank Tester ❑Other(Specify) <br /> License Number(s): 220793 <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ❑Hydrostatic Vacuum ❑Other <br /> Test Equipment Used: I Equipment Resolution: <br /> Identify Spill Bucket(By Tank 1 2 3 4 <br /> Number, Stored Product, etc.) 1-87 Master 2-89 Master 2-87 Siphon 3-91 <br /> Bucket Installation Type: ❑ Direct Bury Direct Bury ❑ Direct Bury ❑Direct Bury <br /> X Contained in Sump X Contained in Sump X Contained in Sump X Contained in Sum <br /> Bucket Diameter: 12" 12" 12" 12" <br /> Bucket Depth: 12" 12" 12" 12" <br /> Wait time between applying 15min l 5min 15min 15min <br /> vacuum/water and start of test: <br /> Test Start Time(Ti): 3:51 pm 3:51 pm 3:5 1 pm 3:51 pm <br /> Initial Reading(Rj): 11 5/8" 11 7/8" 11 3/8" 10 3/4" <br /> Test End Time(TF): 4:51 pm 4:51 pm 4:51 pm 4:51 pm <br /> Final Reading(RF): 11 5/8" 11 7/8" 11 3/8" 10 3/4" <br /> Test Duration(TF—Tj): I hr 1 hr I hr 1 hr <br /> Change in Reading(RF-Rj): 0 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result: X Pass []Fail X Pass ❑Fail X Pass ❑Fail X Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> All Fill Spill Tested Good. <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate, and in full compliance with legal requirements. <br /> Technician's Signature: Date: <br /> ' State laws and regulations do not currently require testing to be performed by a qualified contractor. However,local requirements <br /> may be more stringent. <br />