My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2013 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 1:14:19 PM
Creation date
3/28/2019 10:48:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2017
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECF,m,-i,� <br /> UST SYSTEM RETROFIT OR REPAIR DEC X19 2C'`_ <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHEENVIRONMENTAi, <br /> 1. Site map enclosed? YES V NO [] NFAITN nr:o8DTAAPP T <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> REPLACE DISPENSERS WITH NEW DRESSER WAYNE BLENDING DISPENSERS AND HANGING HARDWARE.CONVERT PHASE II EVR <br /> FROM VAC ASSIST VR-202 TO BALANCE SYSTEM VR-204. REPLACE TURBINES WITH NEW FE PETRO, <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> INSTALL NEW DRESSER-WAYNE OVATION B-12 DISPENSERS WITH FACTORY INSTALLED HI-HOSE RETRACTORS,HANGING <br /> HARDWARE AND ISD FLOW METERS.CONVERT FROM VR-202 TO VR-204 VAPOR RECOVERY SYSTEM. <br /> INSTALL NEW VST BALANCE DISPENSER NOZZLE AND BREAKAWAY AND GOODYEAR EVR HOSES. <br /> CONFIRM VEEDOR ROOT 208 SUMP SENSORS IN EXISTING UDC'S. <br /> INSTALL NEW BRAVO CONVERSION FRAME FOR NON-BRAVO DISPENSERS. <br /> REMOVE(E)TURBINES AND INSTALL NEW 2 HP FE PETRO TURBINES. <br /> INSTALL NEW PLLD PART#848480-001 FOR F.E.PETRO TURBINES <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.