Laserfiche WebLink
by GR Job# 20-630005 <br /> (> Emergency Shut-Off (ESO) Testing Results 8l: Checklist <br /> Facility Information Contractor Information TEST Results <br /> Site# Arco SS 2186 Co.Name: Gettler-Ryan Inc. Date: 1/13/2015 <br /> Address: 3212 N.California Phone 925-551-7555 <br /> Ci /St: Stockton CA Lead Technician: Chris San Nicolas x PASS <br /> eMalnt.W.O.# 9960043 Name: I or <br /> Passport: FAIL(Next Day Repair Required) <br /> Si nature <br /> The objective of this test Is to provide assurance that the when the E-Stop switch Is activated,all the fueling system circuits(turbines,and dispensers)are de-energized,and <br /> remain de-energized until they are re-set manually). The test procedures and guidelines shall be In accordance with the E-Stop Testing Process. <br /> # The following information Is to be completed. x Ta Ul.n <br /> r.• No MIA <br /> WE DATA <br /> 1 Number of E-Stopswitches: 1 <br /> 2 Type of Switch? Push Pull x Momentary Plain light/Toggle_ Other: <br /> (if Momentary type,locate and identify re-set button): In Elect Room <br /> 3 Type of Turbine Control Relay System(Electrical Distribution Center): <br /> —Brown Box _Power Solution x Other Custom Fabricated <br /> 4 Type of Turbine Control Relays: Make Red Jacket Model <br /> Flow ContrQ01- <br /> 5 Type of Line Leak Detection: Mechanical ELD/CPT x PLLD <br /> PERFORMANCE TEST <br /> 6 Does the E-Stop shutdown power to the DISPENSERS x <br /> 7 Does the E-Stop shutdown power to the TURBINES x <br /> 8 Is the 220 voltage to the turbine relay removed(either the line side or the motor side of the contacts or the coil)? x <br /> g Are the DISPENSER BREAKERS clearly identified/labeled? x <br /> 10 Are the TURBINE BREAKERS clearly identified/labeled? x <br /> 1 t Are all the ESOs accessible and clearly identified/labeled? x <br /> 12 Did the ESO(s)function correctly(de-energized from either the line side or the motor side of the contacts or the coil)? x <br /> 12A If#12 is NO,briefly describe what was wrong: <br /> 12B How was it Corrected: <br /> 12C If repair or ESO functionality cannot be corrected same day(prior to leaving the site). The technician MUST notify the Site <br /> Manager of the problem,place an"Out of Service"Tag on the ESO(s),and identify an alternate mean(i.e.,locate circuit <br /> panel,clearly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br /> 12D Elite Customer Solution Center has been contacted for the repair. <br /> eMaint.W.O.Ticket# <br /> POST TEST <br /> 11 Site's fueling system is fully operational, MX 12 All equipment secured and any access ports, lids,enclosures are closed.13 All safety barricades,and any debris was been removed. <br /> COMMENTS <br /> Submit completed copy with other documentation In E-Maintenance. <br />