My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2013 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 1:14:19 PM
Creation date
3/28/2019 10:48:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2017
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REC VED <br /> G£TT!£A-RYAN kc. ob# 20-641304.1 <br /> SEP 2 6 2016 <br /> SWRCB,January 2002 ��NN�v/��qq Page 2 of a <br /> s. SECONDARY PIPE MYIR NMENTAL HEALTH <br /> Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer <br /> Other(specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(specify) <br /> Test Equipment Used: Pressure Gouge Equipment Resolution: .5 PSI <br /> Piping Run# 1 PipingRun# Piping Run# Piping Run# <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: Smith <br /> Piping Diameter: 3" <br /> Length of Piping Run: 10" <br /> Product Stored: 87 <br /> Method and location of <br /> Boot to Boot <br /> Piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10min <br /> starting test: <br /> Test Start Time: 1:00 <br /> Initial Reading(Ri): 5psi <br /> Test End Time: 2:00 <br /> Final Reading(Rf) 5psi <br /> Test duration: Ihr <br /> Change in Reading(Rf-Ri): 0 <br /> Pass/Fail Threshold or Criteria: 0 (1 () 0 <br /> Test Results: Pass Fail Pass Fail Pass Fail Pass Fail <br /> Comments-(include information on repairs made prior to testing,and recommend follow-up for jailed tests) <br /> 1)87-1 to 87-2 siphon line. <br />
The URL can be used to link to this page
Your browser does not support the video tag.