My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2013 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 1:14:19 PM
Creation date
3/28/2019 10:48:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2017
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECENFOO <br /> 6ETriER-RYAN INC. Job## 20-641304.1 <br /> SEP 2 6 2016 <br /> SWRCB,January 2002 �p�T� Page 4 of 4 <br /> 7.UNDER-DISPENSER f ��� � TESTING <br /> Test Method Developed By: Tank Manufacturer d v andard Professional Engineer <br /> Other(specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(specify) <br /> Test Equipment Used: Incon Equipment Resolution: 0.0001 <br /> 11 UDC# 5/6 UDC# UDC# UDC# <br /> UDC Manufacturer: Total <br /> UDC Material: Fiberglass <br /> UDC Depth: 31" <br /> Height from UDC Bottom to Top la„ <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to Top 111„ <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> Good <br /> testing: <br /> Portion of UDC Tested(1) 2"Above Piping <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both Yes No NA Yes No NA Yes No NA Yes No NA <br /> product and water)?* <br /> Turbine shutdown response time NA <br /> Is system programmed for fail-safe Yes No NA Yes No NA Yes No NA Yes No NA <br /> shutdown?* <br /> Was fail-safe verified to be Yes No NA Yes No NA Yes No NA Yes No NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting lOmiu <br /> test: <br /> Test Start Time: 1:14 <br /> Initial Reading(Ri): 25368 <br /> Test End Time: 1:59 <br /> Final Reading(Rf) 25356 <br /> Test duration: 1.5min <br /> Change in Reading(Rf-Ri): -0.002 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Results: Pass Fail Pass Fail Pass Fail Pass Fail <br /> Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA <br /> Was sensor properly replaced and Yes No NA Yes No NA Yes No NA Yes No NA <br /> verified functional after testing? <br /> Comments-(include information on repairs made prior to testing, and recommend follow-up for failed tests) <br /> (1)If the entire depth of the UDC is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested.(See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.