Laserfiche WebLink
SWRCB,January 2002 Page_4_of_7_ <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer N Industry Standard ❑ Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑ Pressure ❑ Vacuum N Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: INCON SUMP TESTER Equipment Resolution: +/-0.002" <br /> Sump#87(1) SumpY#87(2) Sump#91 Sump# <br /> Sump Diameter: 48" 48" 48" <br /> Sump Depth: 63" 65" 64" <br /> Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS <br /> Height from Tank Top to Top of 27" 28" 20" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 16" 17" 22" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: DRY DRY DRY <br /> Portion of Sump Tested' ABOVE ABOVE ABOVE <br /> PENETRATIONS PENETRATIONS PENETRATIONS <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Elves ❑No N NA Elves ❑No N NA [:]Yes ❑No N NA ❑Yes ❑No ❑NA <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A <br /> Is system programmed for fail-safe ❑Yes ❑No N NA ❑Yes ❑No ®NA ❑Yes ❑No N NA ElYes ElNo ❑NA <br /> shutdown? <br /> Was fail-safe verified to be Elves ❑No N NA Elves ❑No ®NA [-]Yes ❑No ENA Elves ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10 MIN NOT TESTED 10 MIN <br /> test: <br /> Test Start Time: 12:26 12:26 <br /> Initial Reading(R): 6.3551" 5.5997" <br /> Test End Time: 12:41 12:41 <br /> Final Reading(RF): 6.3539" 5.5996" <br /> Test Duration: 15 MIN 15 MIN <br /> Change in Reading(RF-111): -0.0012" -0.00011, <br /> Pass/Fail Threshold or Criteria: +l-0.002" +/-0.002" +/-0.002" +/-0.002" <br /> Test Result: N Pass ❑ Fail ❑Pass ❑Fail N Pass ❑ Fail ❑Pass ❑Fail <br /> Was sensor removed for testing? ®Yes ❑No ❑NA Elves ❑No NNA ®Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? ®Yes ❑No [DNA Elves ❑No ®NA ®Yes ❑No ❑NA Elves ❑No ❑NA <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ABOVE IS THE LAST OF TWO BACK TO BACK 15 MINUTE TESTS <br /> 87(2)STP SUMP NOT TESTED; DUE TO 87(2)SYPHON FAILURE <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to aan of the questions indicated with an <br /> asterisk(*) is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-I60) <br />