Laserfiche WebLink
R E�a L <br /> by IAN 18 201�GR Job# 17204467 <br /> Emergency Shut-Off (ESO) TestinReIt s Checklist <br /> ;I`IirIRU IV �fv r�L isi r`iLI r� <br /> Facility Information Contractor Information TEST Results <br /> Site#Arco 2186 Co. Name: Gettler-Ryan Inc. Date:1/3/2 018 <br /> Address: Phone 925-551-7555 <br /> 3212 Lead Technician:Alexander Tate x PASS <br /> City/St:Stockton, CA Name: or <br /> eMaint.W.O.# 1 41 Passport: FAIL(Next Day Repair Required) <br /> Si nature <br /> The objective of this test Is to provide assurance that the when the EStop switch Is activated,all the fueling system circuits(turbines,and dispensers)are de•anergized,an <br /> remain de-energized until they are re-set manually). The test procedures and guidelines shall be In accordance with the Estop Testing Process. <br /> tt The following Information Is to be completed. x To sel.d <br /> Yes No WA <br /> SITE DATA xF <br /> Number of E-Sto switches: _ <br /> 2 Type of Switch? Push Pull JK Momentary Plain light/Toggle Other <br /> (if Momentary type, locate and identify re-set button): In Elect Room <br /> 9 Type of Turbine Control Relay System(Electrical Distribution Center): <br /> JZBrown Box n Power Solution Other Custom Fabricated <br /> 4 Type of Turbine Control Relays: Make FE Petro Model Ma2 YFC <br /> 5 Type of Line Leak Detection: Mechanical I IELD/CPT I.LJ PLLD 1u <br /> PERFORMANCE TEST <br /> 6 Does the E-Stop shutdown power to the DISPENSERS X <br /> Wlt <br /> a <br /> 7 Does the E-Stop shutdown power to the TURBINES Xt y4`" <br /> 8 Is the 220 voltage to the turbine relay removed(either the fine side or the motor side of the contacts or the coil)? X <br /> 9 Are the DISPENSER BREAKERS clearly identified/labeled? X e <br /> 10 Are the TURBINE BREAKERS clearly identified/labeled? X <br /> 11 Are all the ESOs accessible and dearly identified/labeled? X <br /> 12 Did the ESO(s)function correctly(de-energized from either the line side or the motor side of the contacts or the coil)? X <br /> 12A If#12 is NO, briefly describe what was wrong: <br /> 126 How was it corrected: <br /> m <br /> 12C If repair or ESO functionality cannot be corrected same da <br /> p y y(prior to leaving the site). The technician MUST notify the <br /> Site Manager of the problem, place an"Out of Service"Tag on the ESO(s), and identify an alternate mean(i.e., locate <br /> circuit panel, clearly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br /> 12D Elite Customer Solution Center has been contacted for the repair. <br /> eMaint. W.O.Ticket# 10141 S 0 9 <br /> POST TEST <br /> 11 Site's fueling system is fully operational. x <br /> 12 All equipment secured and any acoess ports, lids, enclosures are dosed. x <br /> 13 All safety barricades, and any debris was been removed. <br /> COMMENTS <br /> Submit completed copy with other documentation In E-Maintenance. <br />