My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1111
>
3500 - Local Oversight Program
>
PR0544294
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2019 4:09:54 PM
Creation date
3/29/2019 4:06:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544294
PE
3528
FACILITY_ID
FA0007044
FACILITY_NAME
SAFEWAY MEAT PROCESSING PLANT
STREET_NUMBER
1111
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16326007
CURRENT_STATUS
02
SITE_LOCATION
1111 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ii <br /> SITE HEALTH�& SAFETY PLAN <br /> H. Personnel should be cautioned to inform each other of subjective <br /> symptoms of chemical exposure such as headache, dizziness, nausea, <br /> and irritation of the respiratory tract. <br /> I. No excessive facial hair which interferes with a satisfactory fit of <br /> the facepiece-to-face seal, will be allowed on personnel required to <br /> wear respiratory protective equipment. <br /> J. All respiratory protection selection, use, and maintenance shall <br /> meet the requirements of established Western Geologic Resources <br /> procedures, recognized consensus standards (AIHA, ANSI, NIOSH), and <br /> shall comply with the requirements set forth in 29 CFR 1910.134. <br /> K. Appropriate work areas for support, contamination reduction, and <br /> exclusion will be established. <br /> L. Western Geologic Resources personnel on-site. are to be thoroughly <br /> briefed on the anticipated hazards, equipment requirements, safety <br /> practices, emergency procedures and communications methods, <br /> initially and in daily briefings. <br /> M. Contact with surface .and groundwater shall be minimized. <br /> N. Steel toed, boots will be worn on-site at all times. <br /> In addition, the following precautions shall be implemented for all <br /> personnel working on the project site: <br /> Gross decontamination and removal of all personal protective <br /> equipment shall be performed prior to exiting the facility. <br /> Contaminated clothing will be removed and collected in- a drum for <br /> disposal <br /> The Project Safety Officer will be responsible to take necessary <br /> steps to ensure that employees are protected from physical hazards, <br /> which could include, <br /> Falling objects such as tools or equipment <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.