Laserfiche WebLink
SAN . JOAQUIN Environmental Health Department <br /> COUNTY— Linda Turkatte, REHS, Director <br /> i\ Kasey Foley,REHS,Assistant Director <br /> Greatness grows Frere. PROGRAM COORDINATORS <br /> Robert McClellon,REHS <br /> Jeff Carruesco,REHS,RDI <br /> Michael Kith,REHS <br /> Willy Ng,REHS <br /> Muniappa Naidu,REHS <br /> February 4, 2019 <br /> MEGAN MITCHELL <br /> ELITE IV 2535 WIGWAM DR <br /> CTORS BILE COPY <br /> STOCKTON, CA 95205 P3 <br /> Re: SMK CHEVRON <br /> 25651 N HWY 99 SR0080154 <br /> ACAMPO, CA 95220 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the application for a permit to remove all existing dispensers and install six (6) new dispensers <br /> (Wayne Ovation) with Bravo conversion frames (CONV-132000) with a possible cold start on the <br /> underground storage tank (UST) system at the above noted address. The permit has been <br /> approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control District for <br /> any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval prior <br /> to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Elena Manzo at (209) 953-7699 to arrange the following appointments (a 48-hour <br /> notice is required for inspection appointments). <br /> •Verification of the dispenser footprints contained by the under dispenser containment <br /> sumps (UDCs). <br /> • Visual inspection of the piping within the dispensers for any leaks. <br /> • Verification of the installation of the Bravo CONV-132000 conversion frames per <br /> manufacturer's instructions. <br /> • Sensor functionality: Functionality of the monitoring system must be verified to ensure <br /> that monitoring has been restored to meet the requirements of Title 23 California Code <br /> of Regulations and the Health & Safety Code. A copy of the alarm history shall be <br /> printed prior to performing the "cold start" of the monitoring system and made available <br /> at the time of EHD inspection. <br /> Please be aware that the facility cannot operate the UST system prior to the EHD <br /> inspection and approval. <br />