My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006246
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1111
>
3500 - Local Oversight Program
>
PR0544294
>
ARCHIVED REPORTS XR0006246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2019 4:23:36 PM
Creation date
3/29/2019 4:15:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006246
RECORD_ID
PR0544294
PE
3528
FACILITY_ID
FA0007044
FACILITY_NAME
SAFEWAY MEAT PROCESSING PLANT
STREET_NUMBER
1111
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16326007
CURRENT_STATUS
02
SITE_LOCATION
1111 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Groundwater Analytical Results <br /> Laboratory analysis shows that hydrocarbons in the groundwater <br /> have moved in a southerly direction. As shown in Figure 2-3, <br /> groundwater collected from borings B-16 and B-19 have elevated <br /> `' concentrations of TPH. Groundwater for Boring B-21, near the edge <br /> of the city property, contained 6.9 mg/kg of diesel. No benzene was <br /> found in any of the HydroPunch samples. Analyses of the <br /> groundwater samples are shown in Table 2-2. <br /> TABLE 2.2 <br /> Groundwater Sampling Results <br /> �-� Boring# Sample# TPH-Diesel Benzene Toluene EthyMenzme Xylenes <br /> (mg/l) (µg/1) (µg/1) (ug/l) (4g11) <br /> B-16 HP-1 150,000 NIA NIA NIA N/A <br /> B-17 HP-2 0.030 <.50 <.50 <.50 <.50 <br /> B-18 HP-18 0.970 N.A. N.A. N.A. N.A. <br /> B-19 HP-19 160.000 <.30 <.30 <.30 <.30 <br /> ' B-20 HP-20 0.035 <.30 <.30 <.30 <.30 <br /> �- B-21 HP-21 6.900 <3.0 <3.0 97 28 <br /> N.A. = Not Applicable <br /> Monitoring Well Construction <br /> Two of the soil borings, B-20 and B-21, were converted into monitoring <br /> .r wells MW-5 and MW-6, <br /> respectively (Figure 2-4). Both wells were <br /> completed approximately 15 feet into the saturated zone. <br /> Details of the well construction follow: <br /> • The well screen was four inches in diameter, schedule 40, slotted <br /> PVC. A threaded cap was placed in the bottom of the casing, <br /> • The slot size was 0.010 inches based on formation grain sizes <br /> observed during field examination of the drill cuttings from the <br /> saturated zone; <br /> • The well casing was four inches in diameter, schedule 40 PVC. It <br /> was tightly threaded to the screen below and had a locking cap on <br /> top; <br /> 2-4 <br /> c <br />
The URL can be used to link to this page
Your browser does not support the video tag.