Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> TANKS <br /> UNDERGROUND STORAGE TANKS -TANK PAGE 2 3 <br /> VI.PIPING CONSTRUCTION(Chea all chats Pnge 2 of 2 <br /> UNDERGROUND PIPING IABOVEGROUND PIPING <br /> SYSTEM TYPE ®1.PRESSURE. ❑2.SUCTION ❑3.GRAVITY 458 1 ❑1.PRESSURE ❑2. SUCTION ❑3.GRAVITY 459 <br /> CONSTRixnON ❑1.SINGLE WALL ❑3.LINED TRENCH ❑99.OTHER 460 ❑1.SINGLE WALL ❑95.UNKNOWN 462 <br /> MANUFACTURER 912.DOUBLE WALL ❑95.UNKNOWN ❑2.DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER SMITH FIBERGLASS 46,.. j MANUFACTURER 463 <br /> ❑1.BARE STEEL 916.FRP COMPATIBLE W/100% METHANOL ❑1.BARE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL <br /> ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL ❑Unlmown ❑2. STAINLESS STEEL. ❑7.GALVANIZED STEEL <br /> [13.PLASTIC COMPATIBLE W/CONTENTS ❑99.Other ❑3. PLASTIC COMPATIBLE W/CONTENTS ❑S.FLEXIBLE(HDPE) ❑99.OTHER <br /> ❑4.FIBERGLASS [:18.FLEXIBLE(HDPE) ❑4. FIBERGLASS ❑9.CATHODIC PROTECTION <br /> ❑5.STEEL W/COATING ❑9.CATHODIC PROTECTION 464 ❑5. STEEL W/COATING ❑95.UNKNOWN 465 <br /> VII.PIPING LEAK DETECTION(Check all that a (A descri lion ofthemoniurnng proMm shall be submitted w rhe local agency.) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING 466 SINGLE WALL PIPING 467 <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> ❑1.ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP SHUT ❑1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH j AUTO PUMP <br /> OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+ SHUT OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+ <br /> AUDIBLE AND VISUAL ALARMS. AUDIBLE AND VISUAL ALARMS. <br /> ❑2.MONTHLY 0.2 GPH TEST ❑2.MONTHLY 0.2 GPH TEST <br /> ❑3.ANNUAL INTEGRITY TEST(0.1 GPH) ❑3.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> [14. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Cheek all that apply) <br /> ❑5.DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING <br /> INTEGRITY TEST(0.1 GPH) El5. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> SAFE SUCTION SYSTEMS(NO VALUES IN BELOW GROUNDPIPING): ❑6.TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> ❑7.SELF MONITORING SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> GRAVITY FI,OW ❑7.SELF MONITORING <br /> ❑9.BIENNIAL INTEGRITY TEST(0.I GPH) GRAVITY FLOW(Check au Wet apply): <br /> ❑8.DAILY VISUAL MONITORING <br /> ❑9.BIENNIAL INTEGRrrY TEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Cheek aU that apply): PRESSURIZED PIPING(Check all that apply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10.CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check oral ALARMS AND(Check one) <br /> ❑a AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑a AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> ®b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑b AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION DISCONNECTION <br /> ❑c.NO AUTO PUMP SHUT OFF ❑c NO AUTO PUMP SHUT OFF <br /> ®11. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)MM FLAW SHUT <br /> OFF OR RESTRICTION ❑1 I.AUTOMATIC LEAK DETECTOR <br /> ®12. ANNUAL INTEGRITY TEST(0.1 GPH) ❑12.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM SUCTION/GRAVITY SYSTEM <br /> ❑13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS ❑13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Cheek all dui apply) EMERGENCY GENERATORS ONLY(Check all War apply) <br /> ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF" ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF" <br /> AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARMS <br /> ❑15. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITHOUT FLOW ❑ <br /> SHUT OFF OR RESTRICTION 15.AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> ❑16.ANNUAL INTEGRITY TEST(0.1 GPH) ❑16.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑17. DAILY VISUAL CHECK ❑17.DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT ❑1.FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑4.DAILY VISUAL CHECK <br /> DATE INSTALLED 468 N 2.CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS ❑5.TRENCH LINER/MONITORING <br /> 2003 [13.CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS El 6.NONE a69 <br /> DL OWNER/OPERATOR SIGNATURE <br /> I certify dmc We informauon provided herein is tme and activate to rhe best of my knowledge. <br /> SIGNA R10PERATOR DATE 470 <br /> A-A-^- J <br /> NAME O OPRATOR(print) 471 TITLE OFOWNER/ ERAT R 472 <br /> KAREN DHINGSA FACILITY MANAGER <br /> Pemtit Number(Tor local use only) 473 Permit Approved(For local use only) 474 Permit Expiration Date(For local use only) 475 <br /> UPCF(12/99 revised) 12 Formerly SWRCB Form B <br />