SITE.CHRONOLOGY <br /> USA PETROLEUM SS #3696 <br /> TESORO SITE #67080 <br /> LOP SITE CODE: 0001536 <br /> APN: 05814001 <br /> CVRWQCB CASE#3 9 1161 <br /> 10/29/2003 ' The date San Joaquin County Environmental Health Department (EHD)'issued a <br /> well permit for Geoprobes for an environmental site assessment for a real estate <br /> transaction and property transfer. <br /> 12/01/2003 GeoProbe sampling was performed during EHD inspection on this date. Soil <br /> contamination was documented at 35 feetbgs; PID measurements were in the <br /> moderate range. The GeoProbe equipment met refusal at 35 feet below ground <br /> surface (bgs) so the proposed depths of 55 1 o 80 feet were not reached. <br /> 12/03/2003 On this date drilling continued on-site using a drill rig equipped with hollow stem <br /> augers. Soil samples were collected for chemical analysis. <br /> 12/04/2003 Three monitoring wells were completed at 1he site on this date. <br /> 12/17/2003 The three monitoring wells were developed and sampled for the first time on this <br /> date. Depth to water was approximately 47-48 feet bgs. Water samples from <br /> MW-1, the most downgradient well, had T P-diesel at 63 ug/L and MTBE at 4l0 <br /> ug/L. Water samples from MW-2 and MW-3 contained low levels of TPH-diesel <br /> and MTBE near minimum laboratory detecl ion limits. Those ground water <br /> contaminant concentrations have continued to decrease over time. <br /> 11/02/2004 The EHD filed a Notification of Hazardous Waste Discharge and an Unauthorized <br /> Release Report and placed the site in the Local Oversight Program on this date. <br /> 02/07/2005 The date of Baseline Assessment for Soil Boring and Monitoring Well Installation <br /> in which Delta Environmental recommended MW 1 be destroyed and replaced <br /> with a monitoring well 20 to 50 feet down-gradient (south)which would be on an <br /> adjacent property owned by First Lodi Plaza Associates. <br /> 03/19/2008 The EHD staff discussed the site with Central Valley Regional Water Quality <br /> Control Board (CVRWQCB) staff on this date. The off-site property owner has <br /> continued to deny access for installation of a monitoring well. It was agreed that <br /> GeoProbe sampling could be used instead of installation of a monitoring well. <br /> 05/22/2008 A work plan dated May 8, 2008, prepared by Azure Environmental for GeoProbe <br /> sampling down-gradient and south of MW-1 was approved by the EHD on this <br /> date. <br />