My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
3500 - Local Oversight Program
>
PR0544300
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 3:33:52 PM
Creation date
4/2/2019 3:20:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544300
PE
3528
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
02
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACI-L"4ENT C <br /> 1 - <br /> r <br /> LIGHT OIL <br /> b <br /> Light Oil Inventory Control Procedure <br /> The proper delivery, storage and dispensing of petroleum products is a <br /> concern to the management of Kayo. There are three principal considera- <br /> tions: <br /> 1. Temperature/Volume Shrinkage <br /> Product delivered to Kayo is temperature corrected to 60°F (Net <br /> Gallons) as evidenced in most cases by delivery documents. Subsequent <br /> changes in product temperature in' storage may create apparent <br /> discrepancies in inventory measurement. (Supervisors refer to <br /> Inventory Gain or (Loss) - Page 7.3-004.) <br /> 2. ' Faulty Tanks or Pipes. <br /> T <br /> Corrosion, earth movement, electrolysis or mechanical damage may cause <br /> failure in the systema These failures can cause leaks which allow <br /> product to seep into surrounding area. This is an environmentally and <br /> economically unsound condition and Kayo management requires immediate <br /> detection and correction of any such conditions. <br /> 3. Im ro er Deliveries, `Dispensing or Removal <br /> Kayo management is committed to receiving and dispensing proper <br /> , measure of product and is equally, determined that there will be no <br /> unauthorized removal of products. <br /> For these reasons, Kayo Management has provided procedures for you to <br /> follow in order to protect yourself, the environment and our assets. <br /> At opening of business each day, the Store Manager is required by Company <br /> Policy to gauge each product storage to k and record both the inches and <br /> gallons in the "storage tank inventories " section of the Daily Sales Report. <br /> During this process, water finding past is to be used on the gauge stick to <br /> determine any amount of water in the to ks. A note should be made in the <br /> "Other Information" or "Comments" section on the Daily Sales Report indi- <br /> cating the level in inches of any water in the tanks. The product tempera- <br /> ture .in each tank, gauged with a bulk plant thermometer, is to be recorded <br /> on the Daily Sales Report prepared on F iday of each week .and also the last <br /> day of. the month. <br /> On the first day of each month, the Sto a Manager is to record the "Begin- <br /> ning on Hand" from the actual stick inventory taken at opening of business <br /> t that day. Thereafter, the "balance to account for closing inventory" is <br /> 7:3-001 <br /> y <br />
The URL can be used to link to this page
Your browser does not support the video tag.