Laserfiche WebLink
. Y a <br /> K <br /> 14. J — lint Lo171 Cour 3D J(Iit. A. <br /> d ' <br /> Name of Supplier,Owner or Dealer Address- No.and Streets) City State Date of Test <br /> 15. TANK TO TEST 16. CAPACITY From <br /> IN ❑ Station Chart <br /> ` 1` 4 6D Q(90 0 By most accurate l 0 L4 Z Y �ank manufacturer's Chart <br /> 4. F� Nominal Capacity capacity chart availabia <br /> M O Identity by position Gallons Gallons <br /> Company Engineering Data <br /> Is there doubt as to True Capacity 7 ❑ ❑ Charts supplied with r0 Inh- <br /> ' I Brand and Grade See Section"DETERMINING TANK CAPACITY" ❑ Other <br /> 17. FILL-UP FOR TEST Stick Readings Total Gallons <br /> to IA in. Gallons ea.Reading <br /> Stick Water Bottom24 <br /> - before Fill-up � _ Inventory <br /> to%In. Gallons <br /> 111-Li Q Al FrSu Z- ' w✓' <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> " <br /> Tank Diameter 1 5 $Eoduct in full tank(up to fill pipe) <br /> 1 E40 <br /> 64 <br /> 0 . <br /> 0 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK VAPOR RECOVERY SYSTEM <br /> On Y Sea manual sections applicable.Check below and record procedure in log(26). ❑ Stage I <br /> 1P to <br /> �_ ❑ Water in tank ❑ High water table in tank excavation ❑ Line(s)being tested with LVLLT ❑ Stage II <br /> C L v eAZI a Sv 4X � -a <br /> 21. TEMPERATURENOLUME FACTOR (a)TO TEST THIS TANK <br /> Is Today Warmer?I 1 Colder?I I_°f Product in Tank—°F Fill-up Product on Truck—°F Expected Change{ + or - ) <br /> TSTT-ASSEMBLY <br /> ch <br /> 1 Bottom of tank to Grade*........ '-� OIA42- <br /> "•• 22. Thermal-Sensor reeding after circulation -F <br /> Add 30"for 4"L _" digits earest <br /> Add 24"for 3"L or air seal ....... 23. Digits per°F in range of expected change 312 <br /> digits <br /> Total tubing to assemble Approximate <br /> 24. 1046-0 X • �0 �f (0 _ . G - gallons <br /> 20. EXTENSION HOSE SETTING total quantity in coefficient of expansion for � volume change in this tank <br /> qgy <br /> Tank top to grade*................................ full tank(16 or 17) Involved product per°F r ! <br /> Extend hose on suction tube 6"or more 1 <br /> • <br /> below tank tap .........................:. 25. O L{ l -1- 3(2. This is <br /> volume change per"F(24) Digits per"F in test Volume change per digit. test <br /> `If Fill pipe extends above grade,use top of fill. Range(23) Compute to 4 decimal places. tactor(a) <br /> 26. 30. HYDROSTATIC 31. 34. 38.NET VOLUME 36• <br /> VOLUME fAEA$UREItENTS;h TEMPERATURE COMPENSATIONACCUMULA7Ep <br /> LOG OF TEST PROCEDURES PRESSURE RECORD TO.001 GAL. USE FACTOR W CHANGES CHANGE <br /> CONTROL EACH READING <br /> 27. <br /> 29. Stenp p 32. 35. 36. 37. Temperature At Righ Lem record 28. e Inches Product in Product Chance Computation Adjustment low End atinecti0e <br /> 11AIE Record details of setting up aeadlrlg Graduate Replaced(—) Thermal Higher+ [c) x (el Volume Minus <br /> and running test.(Use full so. Beginning Level to Sensor Lower— Expansion+ Expansion(+)or At Low Lewd Compute <br /> E length of line if neaded.l of which Before After Product Reading (cl Contraction— Contraction(—) Cheap per bor <br /> TIME{Z4 E Reading Restored Reeding Reading Recovered[+) x3MV)—037(T) (aFPA vIhu a1 <br /> Ofa�D Q��UEr dal � <br /> rG43n. _f�i.+ f /1 n v_.i-r-2rc S --- <br />