My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
3500 - Local Oversight Program
>
PR0544300
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 4:12:50 PM
Creation date
4/2/2019 3:23:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544300
PE
3528
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
02
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CAUFQRhlA3 `, GEORGE DEUKMEJiAN,Governor <br /> CALIFORNIA REGIONAL M . R QUALITY CONTROL BOARD f-W"- GEORGE <br /> CEffrRAL`VALLEY REGION <br /> 3443 ROUTIER ROAD <br /> SACRAMENTO,CA 95827-3098 <br /> 28 June 1988 <br /> �� ff}}N ///���9 <br /> J U 2 <br /> ENVIM(3Mbt TAL HEALTH <br /> FERMIT/SERVICES <br /> Mr. Michael Hansen . <br /> Kayo Oil Company <br /> P.O. Box 190 <br /> Y y Lodi, CA 95241 - <br /> FINAL .REMEDIAL PLAN (FRP) FOR,8.00,`EAST-HIGHWAY_ 12�INf`LODI- . <br /> Thank you for submitting the FRP prepared by Groundwater <br /> Bioremediation Services (a Du Pont subsidiary) . The report is <br /> well prepared, and, based on information presently available to <br /> us, we concur with the proposed remediation. <br /> As this in-situ bioremediation ap�roach for site remediation is <br /> largely untested in California we *equest that Remedial Progress <br /> Reports (RPR) be submitted on a bi-monthly basis until it is <br /> reliably established that the system is operating as predicted. <br /> Based on the projected time schedule in the FRP, the first RPR is <br /> due 3 October 2988. <br /> If you have any questions, please call me at (916) 361-5731. <br /> Ac7 <br /> GARY S. JOHNSON <br /> Engineering Geologist <br /> GSJ:gj <br /> cc: L4 s. Laurie Cotulla, San Joaquin Local Health District, <br /> Stockton <br /> Mr. Dave Ellis, Groundwater Bioremediation Services, <br /> Wilmington, Delaware <br />
The URL can be used to link to this page
Your browser does not support the video tag.