My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
3500 - Local Oversight Program
>
PR0544300
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 4:12:50 PM
Creation date
4/2/2019 3:23:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544300
PE
3528
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
02
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kayo. Status Report <br /> FEBRUARY12, 1988 page 8 <br /> pending to confirm this <br /> necessarsuspicion . Additional field work maybe <br /> y. <br /> Fast Gas <br /> -. .;sem <br /> Env. Assessment Consultant : Du Pont <br /> A groundwater recovery/treatment system has been installed at <br /> this site since November 1985. A groundwater recovery well - has <br /> been operating and is pulling the colntaminated water back toward <br /> the well . The Dupont In Situ Biorecl.amation group .-has prepared <br /> a draft 'plan - for continued 'subsuriace ' investigat3�on :-and ',,blo <br /> remediation of the contamination. This plan was submitted to. <br /> RI%7QCB, field work outlined in plan has been ' . conducted, . <br /> r contamination extends beyond limits of drilling,.::, further_ <br /> exploration required, -property access in -progress, permit- appli- <br /> cation submitted . Vineyard too wet for drilling access . <br /> Periodic monitoring being conducted . Final report due early <br /> 1988 . <br /> . i <br /> I <br /> I� <br /> Econo Gas Stati.on„,w. <br /> 9.325 Ea°fit ,Washington <br /> Stockton, CA y s <br /> Env, Assessment Consultant : Du Pont <br /> Phase II and III has been completed . Wells are being developed <br /> and sampled . Extraction well for pump test will be installed <br /> January 21, 1988 . Pump test to bei conducted early February. <br /> Groundwater sampling and analysis for Quarterly report . Draft <br /> PAR due March, 1988 . <br /> Fast Gas <br /> M <br /> 1919 West Clinton <br /> Fresno, CA <br /> Env. Assessment Consultant : Applied CeoSystems <br /> i <br /> Remediation Consultant : Applied GeoSy stems <br /> This property is leased by Kayo and will be returned to the <br /> property owner . It-- is my understanding that it will be leased' <br /> -- to 'another, party. <br /> , e . <br />
The URL can be used to link to this page
Your browser does not support the video tag.