Laserfiche WebLink
F. Remove and replace wells in any convenient order. <br /> G. Install new monitorinig wells. <br /> H. Conduct aquifer tests: <br /> I. Install and develop additional r covery well or wells to be <br /> designated. <br /> J. Install groundwater recovery pumps in designated recovery <br /> wells. Install beiowl1ground piping to connect recovery wells <br /> to air stripper system. Install below ground piping to <br /> connect designated injection wells to nutrient control <br /> 'f <br /> system. <br /> I <br /> u <br /> i <br /> 3 <br /> 3 <br /> .y <br /> i <br /> 9 <br /> i <br /> E <br /> 7 <br /> k i <br />}k <br /> 3 � <br />