Laserfiche WebLink
C R 1 U N 1) A I I R <br /> I A I 1 (-1 N <br /> S F R \1 I C F S <br /> Barley Vin Pl""r Wilmington.DE 19898 <br /> December 14, 1987 <br /> Mr. Michael Hansen <br /> Kayo Oil Company <br /> 900 S. Cherokee Lane I <br /> Lodi , CA 95240 <br /> Dear Mr. Hansen: <br /> This letter is our proposal to complete the contamination assessment <br /> at the 4325 Washington Street:, Stockton, Cq site. We recommend drilling <br /> four wells in the next phase ,"ipf characterization. <br /> 7 <br /> The proposed well locations are shown on the attached map as MW-20P, <br /> MW-21P, MW-22P and MW-23P. These wells wojld be drilled to a depth of 60- <br /> 65' . They will be screened o'er a length )f 15' at the appropriate depth <br /> range to allow sampling at the water table year round. Soil samples for <br /> chemical analysis will be coljlected at app ,opriate depths during drilling. <br /> Water samples will be taken after the well are developed. All monitor <br /> well installation will be sup'e' rvised by a alifornia registered geologist. <br /> We plan to continue using the'asame subcont ,actors operating under the same <br /> protocols as in the last phaso of assessmeit. <br /> We understand that Kayo -has obtained permission for sampling <br /> monitoring wells installed by� the Marley Co. We have requested Marley's <br /> permission to sample wells MW.L303 and MW-304 immediately. <br /> If groundwater hydrocarbb' n contaminat- on is found to extend beyond the <br /> ring of monitoring to be installed, we suggest moving out as needed to the <br /> locations marked as MW-24P, MW-25P, MW-26P, and MW-27P. We do not <br /> anticipate that any or all of,';these contingency wells will be needed. <br /> However, we would like to propose them in advance, in order to have the <br /> required regulatory approvalsilin advances that we can move quickly if any <br /> more -wells are needed. We will consult with Kayo before drilling any well <br /> beyond the four proposed in piragraph two. <br /> We believe that we can meet the extended deadline of March 14th, <br /> assuming no unexpected regulatory delays occur. <br /> A <br /> Sincerely, <br /> David E. Ellis <br /> Operations Manager <br /> Attachments <br /> li <br /> U=PON I) <br />