Laserfiche WebLink
Kayo Status Report Page 6 <br /> May 8, 1987 , <br /> Jet Station <br /> 2430 Fifth Street <br /> Sacramento, CA <br /> Env. Assessment Consultant : Dames and Moore <br /> The underground tanks weie removed on October 21, 1986 . Some <br /> minor soil contamination was rem ved and aerated onsite . <br /> Approximately two feet of soil was removed from the bottom of <br /> the north tank pit . The south tank pit was not contaminated . <br /> Dames and Moore was contracted to conduct the second phase of <br /> site investigation work . ;; They ins alled four new monitoring <br /> wells and collected soil samples on ite . One monitoring well <br /> was installed offsite, onkthe east s de of Fifth Street . Dames <br /> and Moore ' s report is duej;May 10, 1987 . <br /> .i <br /> I <br /> H <br /> -Beacon I <br /> 1705 Second Street <br /> Selma CA <br /> Env. Assessment Consultant : Applied CeoSystems <br /> Remediation Consultant: Applied Geos stems <br /> This station was previously owned by Kayo but was sold to <br /> Beacon. Kayo is responsible for the existing contamination at <br /> the station. <br /> Applied GeoSystems has completed the installation of five soil <br /> borings which have beenl converted to monitoring wells . A <br /> remediation plan was submitted on March 10, 1987 . The plan <br /> consists of a groundwaterf recovery Eystem and an air stripper . <br /> Verbal approval for the permits to o erate the system have been <br /> given and Applied - GeoSystems is in tie process of acquiring the <br /> written permits . It is :,hoped that remediation will start by <br /> June 1, 1987 . <br /> 1 <br /> Fast Gas <br /> 153 East Eleventh Street <br /> Tracy, CA <br /> Env. Assessment Consultants : Phase I - Dames and Moore <br /> Phase II - Groundwater Technology <br /> Remediation Consultant : Groundwater lechnology <br /> ry <br /> .�I <br /> IE <br /> I; <br />