Laserfiche WebLink
F <br /> 0 <br /> TABLE 8 . <br /> r PROJECTED TIME SCHEDULE FOR SITE PREPARATION, AQUIFER TESTING, <br /> AND INSTALLATION OF REMEDIATION SYSTEM* <br /> f <br /> r <br /> COMPLETION <br /> PHASE I : SITE PREPARATION WEEK <br /> s <br /> CVRWQCB Approval 0 <br /> Award Drilling Contract 1 <br /> Redrill or Abandon Existing Wells 4 <br /> Aquifer Stabilization Period 5 <br /> Complete Aquifer Testing 6 . <br /> Interim Connection o.f MW-19 to Air Stripper 6. <br /> Evaluate-Tests and Model Groundwater F.1 ow 9: <br /> .J Prepare .Report.. 1.0 1 . <br /> PHASE II: BIOREMEDIATION <br /> CVRWQCB Approval 12 <br /> Obtain Drilling Permits 13 <br /> Drill `Additional: Wells for Remediation 14 <br /> Y Construct and Install Nutrient Addition System 16 j <br /> Initial Tests of Nutrient' Circ ulation, System 17 3 <br /> Nutrient and Hydrogen Peroxide Addition Begin 1$ <br /> Y <br /> 5 k $ Delays beyond those anticipated for regulatory approvals will <br /> result io"sommensurat'e delays in`the `rest of the program. <br /> j <br /> y -40e y <br /> 4 <br /> , <br /> n .,. <br />