Laserfiche WebLink
— <br /> ¢ to <br /> Beacon No. 696 - Lodi <br /> Work Plan <br /> Page No. 13 <br /> investigation, drilling soil borings, and installation of monitoring wells <br /> { <br /> at the site. The Site Safet; Pian is applicable to personnel and <br /> subcontractors of the consultant. The consultant's personnel (and <br /> i � <br /> subcontractors) scheduled to perform work at the site will be briefed on <br /> the contents of the Site Safety Plan before work begins. A copy of the <br /> Site Safety Plan will be kept at the site and will be available for <br /> reference by appropriate parties during work at the site. A Site Safety : <br /> Officer will be appointed for the duration of the subject work at the <br /> site. <br /> - ; ling. <br /> Appropriate permits will be acquired prior to corimencement of drilling. <br /> Underground Service Alert.will be contacted prior to drilling to delineate <br /> public utility lines. Initially, each borehole,will be hand-angered .to a <br /> } aninimurr depth of.5 feet. <br /> The soil borings will be drilled usingcontinuous-flight, hollow-stem <br /> ' augers and struck-mounted drill rig. The anger flights will be <br /> steam-cleaned prior to each use to minimizethe possibility of <br /> E cross-contamination between; borings. . Drilling will be performed under the <br /> x. guidance of a field geologist'or engineer, and the earth materials <br /> ,r encountered in .the'borings will be logged as drilled. Soil samples will <br /> be logged-using the Unified Soil Classification System and recorded onto a <br /> ,� — � — -boring:log-form.—'-- ----- -- - ---- -------- ----- ---- ---- --- ----- -- - <br /> a. <br /> 7 <br /> N, <br /> 3 s+ <br />