Laserfiche WebLink
{ Mi;R 05 tee 22:23 EXCELTECk/SF P.10 <br /> March 6, 1955 <br /> 4 Fast-Gas Station EXCEII.TECH project No. 1813G <br /> Page 7 <br /> 4.0 <br /> - i <br /> g <br /> The test information collected was analyzed using the Jacob straight line <br /> method. Drawdowns were adjusted prior to plotting using the Jacob (1963) <br /> method because significant pumping drawdowns occurred. Calculated <br /> transmissivities using this method for the aquifer vary from 5,155 to 7,425 <br /> gallons p®r foot per day (gpf/day). Calculated storage coefficients range <br /> 1 <br /> i from 0.0064 to. 0.014. <br /> ;t <br /> 51f} cx�lyCj i <br /> Saeed on aquifer tests conducted at this site, in our opinion an average <br /> transmissivity of 8,000 gpf/day may be estimated. The cane of depression <br /> produced during the constant-discharge test affected most of the site after <br /> f <br /> approximately 15 hours. <br /> ks <br /> The Information cJ!dained within this report Is based on the following: <br /> { <br /> 1, Thi exploratory borings drilled at the site. <br /> �Vic, <br /> Y, z <br /> The observations of field personnel and data recorded by the equipment <br /> 2.4 <br />