Laserfiche WebLink
Ultramar <br /> Ultramar Inc. Telecopy: 209-584.6113 Credit&Wholesale <br /> P.O.Box 466 209-583-3330 Administrative <br /> 525 W.Third Street 209-583-3302 Information Services <br /> Hanford,CA 93232-0466 209-583-3358 Accounting <br /> (209)582-0241 <br /> ENVIRONMENTAL PROJECT <br /> QUARTERLY STATUS REPORT <br /> DATE REPORT SUBMITTED: November 18, 1994 <br /> QUARTER ENDING: December 31, 1994 <br /> SERVICE STATION NO. : 696 <br /> ADDRESS: 2448 West Kettleman Lane, Lodi , California <br /> COUNTY: San Joaquin <br /> ULTRAMAR CONTACT: Kenneth R. Earnest TEL. NO: 209-583-5571 <br /> BACKGROUND: <br /> Ultramar purchased site from Conoco in July 1990. Several <br /> ground-water monitoring wells had been installed by Conoco <br /> (formerly Kayo Oil Company) at and near the site. At the time <br /> of site purchase, all but one well (MW-20) was dry. A vapor <br /> extraction system was operated at the site until the end of <br /> December 1990. The thermox unit was then removed and <br /> permitting for a catalytic unit was initiated. <br /> In February 1991 , three additional ground-water monitoring <br /> wells (MW-34, MW-35, and MW-36) were installed along the <br /> south, east, and west boundaries of the site in an effort to <br /> evaluate both ground-water gradient and water quality. Soil <br /> and ground-water analyses showed nondetectable to low TPH9 and <br /> benzene concentrations. <br /> A permit application for a catalytic incinerator was submitted <br /> to the APCD for processing and the unit began operation on <br /> August 23, 1991. <br /> The catalytic unit was removed and granular activated carbon <br /> was installed on September 9, 1992. <br /> SUMMARY OF THIS QUARTER'S ACTIVITIES: <br /> Groundwater Monitoring was performed October 14, 1994. <br /> 0 <br /> BEACON <br /> A Member of the Ultramar Group of Companies fit Quality and Service <br />