Laserfiche WebLink
Proje.a Boring <br /> PROJECT NAME/LOCATION: Number D093-916 Numher CB-5 <br /> Beacon Station No. 696 Con- Drilling <br /> 2448 W. Kettleman Lane tractor Turner Explorations, Inc. Method 8" HSA <br /> di, CA <br /> Driller Kevin Barnet[ Drilling <br /> Rig B-53 <br /> Start 12:00 p.m. 09/07/94 Completed 2.15 a.m. 09/07194 <br /> Landowner: Ultramar Inc. Surface Logged <br /> Elev.. --- By Mike Berrington <br /> Sample: Sample Depth <br /> Blow: Scale: Descriptions,of.Materials <br /> Type Na Count Interval Recovery: i : - 4. and.Conditions. <br /> Comments <br /> 48 <br /> 49 <br /> CAM CB-5-50 12 16 50 LEAN CLAY WITH SAND; olive, very stiff, <br /> 28 low plasticity, fine sand, moist (CL) <br /> 42 51 <br /> 52 Total depth at 50 ft. <br /> 53 <br /> 54 <br /> 55 <br /> 56 <br /> 57 <br /> 58 <br /> 59 <br /> 60 <br /> 61 <br /> 62 <br /> 63 <br /> 64 <br /> 65 <br /> 66 <br /> 67 <br /> 68 <br /> 69 <br /> 70 <br /> 71 <br /> Bs7REHOLE W 4TER.LEVEI: DATA <br /> Defta <br /> �/� Environmental <br /> Consultants,Inc. <br /> Sheet 3 of 3 <br />