Laserfiche WebLink
Quarterly Site Status Report <br /> Beacon Station 696 - Lodi , California <br /> Page 2 <br /> The King Buck was replaced with carbon units on September 9, <br /> 1992. <br /> RESULT OF QUARTERLY MONITORING: <br /> Ground-water samples from MW-20 (southeastern portion of the <br /> property) and MW-35 (west boundary of the property) exhib;ted <br /> non-detectable amounts of benzene MW-34 (southern boundary <br /> of the property) and MW-36 (eastern boundary of the property <br /> all exhibited exhibited 2.3 and 0.93 ppb benzene respectively. <br /> These data suggest that hydrocarbon previously detected in <br /> ground-water samples from monitoring wells at the site have <br /> been volatilized and destroyed in the vapor extraction system <br /> PROPOSED ACTIVITY OR WORK FOR NEXTQUARTER: <br /> ACTIVITY ESTIMATED COMPLETION DATE <br /> Perform Fourth Quarter ground-water <br /> monitoring event November 1992 <br /> Continue to monitor VES On-going <br /> 16 <br />