Laserfiche WebLink
RECEIVED <br /> I- I ik.'il_TH �1 i J <br /> 3330 Data Drive <br /> �/. Delta _ Suite 1°° <br /> �" ;; '�` — (� i ; f� Rancho Cordova,CA 95670 <br /> Environmental 9161638-2085 <br /> Consultants,Inc. FAX:9161638-8385 <br /> April 21, 1994 <br /> Mr. Kenneth Earnest <br /> Ultramar Inc. <br /> 525 West Third Street <br /> Hanford, California 93230 <br /> Subject: Quarterly Soil Vapor Extraction Report, First Quarter 1994 <br /> Beacon Station No. 696 <br /> 800 Highway 12 <br /> Lodi, California <br /> Delta Project No. 40-93-916 <br /> Dear Mr. Earnest: <br /> Delta Environmental Consultants, Inc. (Delta), has been authorized by Ultramar Inc. to operate a soil <br /> vapor extraction system at the subject site (Figures I and 2). The purpose of the system is to <br /> remediate gasoline-impacted soils underlying the site. Petroleum vapors in the soils are vented <br /> through ten soil vapor extraction wells (MW-2, MW-5, MW-7, MW-10, MW-19, MW-20, MW-24, <br /> MW-28, MW-34, and MW-35). Locations of the soil vapor extraction wells are shown on Figure 2. <br /> Evax Technologies, Inc., began operation of the soil vapor extraction system utilizing a 100 standard <br /> cubic feet per minute catalytic oxidizer on site in August 1991, and continued to operate the system <br /> until September 21, 1992. During catalytic operation it has been estimated that approximately 9,094----_ <br /> pounds of hydrocarbons and 24 pounds of benzene were removed from soils underlying the site. <br /> Operational data collected prior to September 21, 1992, has been presented in Evax Technologies, <br /> Inc., "Soil Vapor Extraction Quarterly Monitoring Reports". On September 21, 1992, Delta was - <br /> authorized to remove the existing catalytic oxidizer and install two 2,000-pound vapor phase granular <br /> activated carbon columns in series as the abatement device for the soil vapor extraction system. The <br /> two 2,000 pound carbon columns were replaced with two 200 pound carbon columns on <br /> November 1, 1993. The soil vapor extraction system flow diagram is presented in Figure 3 and the <br /> system detail is illustrated in Figure 4. <br /> During the first quarter of 1994 it is estimated that 113 pounds of hydrocarbons were removed from <br /> soils underlying the site. Since the system began operating in August 1991 approximately 10,290 <br /> Pounds of hydrocarbons have been removed from soils underlying the site. A summary of extraction <br /> and emission rates since September 24, 1992, are presented in Enclosure A. <br /> • <br /> Delta Delivers Solutions <br />