Laserfiche WebLink
SIIr6VnZ1I1RWAL SAMPLING INFORMATION SHEET <br /> ^ 9-A <br /> � I <br /> C:lent.. 9A CDAI Project No: --73 <br /> Site: Z� - ,� Well Designation: , ,� <br /> ka2>r , C4. <br /> Purging Equipment: X 2" Disposable bailer <br /> 2" PVC bailer Submersible pump <br /> 4" PVC bailer Dedicated bailer <br /> Sampled with disaosai bailer: Teflon Bailer: Q <br /> Well Diameter: 2" X 3" 4" _ 6" S" <br /> Purge Vol. Muitiplier: Q.163 0.367 0.653 1.47 2.61 gau/ft. <br /> Initial Mensurment Recharge Measurement <br /> Time: Time: Calculated purge: <br /> Depth of well: -t,a`a Depth to water: Actual purge: <br /> Depth to water: <br /> Meter Calibration Temo. E.C. pH Turbidity <br /> Date Initial reading <br /> Time Adjusted reading <br /> Start purge: Sampling time: Sampling Date:�� <br /> Time Tema. E.C. pH Turbidity Volume <br /> Sample appearance: <br /> aC samples collected at this well: Lod*: <br /> Equipment,replaced: (Check al! that appiyl Note conaidon at replaced item. <br /> 2" Locking Cap: Lock #2357: <br /> 4" Locking Cao: Lock #3753: <br /> Remarks: <br /> Signature Review <br />