Laserfiche WebLink
MONITORING WELL INSTALLATION REPORT <br /> Fast Gas, Lodi, California WELL No. : 18 <br /> PROJECT- Fbx ErWirormental - KAYO Oil OMPany LOCATION: Hiqhway i, i <br /> PROJECT NoT„ 385-124-01 INSTALLED BY: G. Kiger =/ IME: 9-25-85/11 a.m. <br /> METHOD OF INSTALLATION: 7be boring was made using 8-inch augers. Tte pipe was <br /> lowered through the aw auger auger rats . Te depth of seals and; of <br /> Pipe installed is shown on the sketch be ow. <br /> MONITORING WELL INSTALLATION DATA <br /> TYPE OF WELL: Grourdwater MonitoriM GROUND ELEV.. -TOP OF RISER ELEV. : -� <br /> -Type of Cap: Sealed/10&ed <br /> • L� <br /> I .D. of Riser Pipe.: 2-inch <br /> I Type of Pipe Schedule 40 PVC <br /> L2 ! i <br /> Ll s 0'-3" L5 � Type of Backfill Around Riser <br /> Lz . 15'-6" <br /> 20% Bentonite, 80% Cement <br /> ! <br /> Top of Seal Elev. : 151-6x. <br /> L3 . l'-0" <br /> Type of Seal Material : <br /> L4 - 54'-0" L7 1/4-inch Bentonite Pellets <br /> L5 = 20'-8" L3 <br /> L6 . 50'-0" <br /> L 74'-6" Top of Filter Elev. : 16'1-6117 <br /> ?._Type of Filter Material : <br /> E.•� „ .:I 5/16" Pea Gravel <br /> I.•' Size of Openings 0.020-inch <br /> L� f �` Diameter of Tip:p'. 2-inch <br /> L6 <br /> I' <br /> ,I Bottom of Well Elevation: 70'-8" <br /> „ Bottcm of Boring Elevation- 74'-6" <br /> Diameter of Boring: 8-inch <br /> REMARKS: <br /> �lt��a.rrufi� rtbGl�tct�.C.f.�i7t. <br /> Fresno Modesto Visalia 8akerstield <br />