Laserfiche WebLink
WEST MATHEWS ROAD <br /> .. <br /> N <br /> STORM DRAIN <br /> f <br /> 9° <br /> j O <br /> � a <br /> ----� JLM-4 I m <br /> <0.5 j r— <br /> QIJLM-12 (---� <br /> k <br /> 1.6 EXISTINGFORMI <br /> UST AREA 1 <br /> — <br /> UST ARREEA-- �2 7_5 j I j <br /> o BUILDING <br /> JLM -18 <br /> j <0.5 <br /> Fn PARKING LOT <br /> m <br /> .OSW 1.0 GARAGE <br /> I <br /> $JLM-3 <br /> 4.0 <br /> U JLM 13 <br /> 0 <br /> <0.5 <br /> BUILDING <br /> JLM-19 <br /> <0.5 <br /> JLM-17 MARKET JLM-14 f <br /> <0.5 <br /> <0.5 $ <br /> f <br /> JLM-15 <br /> <0.5 <br /> JLM--16 <br /> <0.5 <br /> RESIDENCES <br /> DELICATESSEN <br /> LEGEND: <br /> GROUNDWATER MONITORING WELL BUILDING <br /> f.6 MTBE GDNCENTRATION IN MICROGRAMS PER LITER <br /> MTBE ISOCONCENTRATION IN MICROGRAMS PER LITER <br /> ON-SITE SUPPLY WELL (OWROYED) APPROXIMATE SCALE <br /> 0 40 80 FEET <br /> J&L MARKET MTBE ISOCONCENTRATION MAP FIGURE. <br /> 8125 SOUTH ELDORADO MARCH I, 2006 <br /> xesoauTce Axa FRENCH CAMP, CALIFORNIA5 <br /> PROJECT #: 54.28589.00011 <br /> MARCH 2006 <br />