Laserfiche WebLink
PUBLIC 10EALTH SERV�CES <br /> SAN JOAQUIN COUNTY <br /> �o.�.�•.cac <br /> 2.. <br /> ENVIRONMENTAL HEALTH DIVISION m <br /> Ernest M. Fujimoto, M. D., M.P.H., Acting Health Officer <br /> 304 E. Weber Ave., Third Floor • P. O. Box 388 • Stockton, CA9 Ol-03388 "-� cFoRii\ <br /> 209/468-3420 <br /> MAILED DEC 0 51995 <br /> JIM FISK <br /> 1 & L MARKET <br /> P 0 BOX 147 <br /> FRENCH CAMP CA 95231 <br /> RE: 1 & L MARKET SITE CODE: 1563 <br /> 8125 S EL DORADO CONTRACTOR #: 39000 <br /> FRENCH CAMP CA 95231 <br /> San County Public Health Services, Environmental Health Division (PHD/EHD) is the lead agency providing the oversight of <br /> the investigation and cleanup of releases from underground storage tanks within San Joaquin County. PHS/EHD has a contract <br /> with California State Water Resources Control Board to conduct an underground storage tank corrective action program. Section <br /> 25299.37(c) of the Health and Safety Code provides us the authority to require an investigation and cleanup of unauthorized <br /> releases. The above referenced site was placed in the Local Oversight Program (LOP) in November 1995. <br /> PHS/EHD provided oversight in November 1995 during overexcavation of contaminated soil that was removed from the former <br /> tank/piping location. The excavated soil was removed off site for treatment and the excavation backfilled with clean material. <br /> Soil sample results from the final limits of the excavation are pending and a groundwater investigation maybe warranted. A <br /> Preliminary Investigation And Evaluation Report (PIER) must be prepared and submitted to this office within 90 days of this <br /> letter. <br /> PHS/EHD has reviewed your file to determine if you are in compliance in regards to permitting and corrective action orders and <br /> directives. Regulatory compliance is a requirement for reimbursement of cleanup costs from the State Water Resources Control <br /> Board Underground Cleanup Fund Program. <br /> Eventhough PHS/EHD did not issue active UST permits until mid-1990, the above referenced site has been inspected and in <br /> compliance with UST regulations since 1986. Several required operating permits have been issued for this site by PHS/EHD since <br /> mid-1990. <br /> If you have any further questions regarding this matter, contact Harlin Knoll, at(209) 468-3442. <br /> Donna Heran, REHS, Director <br /> Envi nmenta�ljH�ealth Division <br /> /</,,,� J <br /> Harlin Knoll, Senior REHS Diane M. Hinson, REHS <br /> Site Mitigation Unit Supervisor <br /> HK:lb <br /> c: SWRCB - Annabel Mackey, Underground Storage Tank Program <br /> c: CVRWQCB - Elizabeth Thayer <br /> A Division of San Joaquin County Health Care Services <br />