Laserfiche WebLink
Thank you for your email. I will review our submission within the next three days and resubmit. <br /> Thank you <br /> Kaytee <br /> Kaytee Heinerkheiner@revchem.com <br /> Cell: (909) 419-3090 <br /> Director of Operations Office: (909) 316-6639 <br /> Revchem Composites www.revchem.com <br /> From: Robert Lopez [EH] [mailto:rlopez@si>;ov.org] <br /> Sent: Friday,June 21, 2019 3:54 PM <br /> To: Kaytee Heiner<KHeiner@revchem.com> <br /> Subject: PR0523432; Revchem Composites Submittal Review Findings and Amended Inspection Report <br /> Mrs. Keiner, <br /> I have reviewed the submittals and have found the following issues: <br /> • Violation #5, Inventory not complete. <br /> - Polyurethane A—the storage pressure and storage temperature elements have not been completed. <br /> - Polyurethane B—the size of the largest container and hazardous materials type elements have not been <br /> completed. <br /> - Mold cleaner-the storage pressure and storage temperature elements have not been completed. <br /> - Body fillers-the storage pressure and storage temperature elements have not been completed (sub- <br /> quantity). <br /> - Aerosols—the days on site element has not been completed (sub-quantity). <br /> - Propane—the storage pressure is wrongly identified as "ambient"vs. "above ambient". <br /> - QM 240 T A&B-the storage pressure and storage temperature elements have not been completed <br /> - BPO (cream hardener)—the days on site element has not been completed (sub-quantity). <br /> - Cobalt Catalyst—the days on site element has not been completed (sub-quantity). <br /> - Note, all sub-quantity has been reported a below reportable amounts. If a material does not reach a <br /> reportable quantity during the reporting year it is not required to be reported in the chemical inventory. <br /> • Violation #6,the site map is not complete (map guidance documents attached). <br /> - The site map does not show/address loading areas, storm drains, access and exit points (structure), <br /> hazardous material handling and storage areas. A site map shall contain a north orientation, loading <br /> areas, internal roads, adjacent streets,storm and sewer drains, access and exit points, emergency <br /> shutoffs, evacuation staging areas, hazardous material handling and storage areas, and emergency <br /> response equipment. If a site map element is not applicable for your facility then list it on the map and <br /> label as "NA". <br /> I have amended the original inspection report to add the narrative for violation 11 (see attached). <br /> As of September 1, 2018, all in-office CERS help will be provided at EHD hourly rate ($152). To schedule an <br /> appointment, please call (209)468-3420. <br /> 2 <br />