My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
502
>
2200 - Hazardous Waste Program
>
PR0505941
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2024 2:39:30 PM
Creation date
4/5/2019 8:21:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505941
PE
2220
FACILITY_ID
FA0006033
FACILITY_NAME
PG&E: Tracy Service Center
STREET_NUMBER
502
Direction
E
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
250-020-05
CURRENT_STATUS
01
SITE_LOCATION
502 E GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2220_PR0505941_502 E GRANT LINE_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
453
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5J. EMERGENCY EXCAVATION AT MANUFACTURED GAS PLANT SITES <br />1. Notify the supervisor on call and the Facility Emergency Coordinator or <br />Alternate. <br />2. Notify the Environmental Services -Department (Gas Plant Project) and <br />Safety, Health and Claims: <br />Environmental Services: Robert C. Doss <br />(415) 972-7601 <br />or <br />Victor C. Furtado <br />(415) 972-7746 <br />Safety, Health, and Claims: Marcia Dunham <br />(415) 972-2300 <br />Hi <br />M. David Gidley <br />(415) 972-1946 <br />3. Refer to the Company's Excavation Guidelines for Manufactured Gas Plant <br />Sites, which is available from your Environmental Coordinator. This <br />response procedure summarizes these guidelines. <br />4. The Facility Emergency Coordinator or the facility supervisor must remain <br />on-site to supervise the work and to ensure the excavation guidelines are <br />being followed. <br />5. Try to isolate the affected area and order all personnel not involved with <br />the incident to leave the area. <br />6. If excavated soils are to be temporarily stockpiled on-site, place soils <br />in a secured area of the facility. Isolate the stockpile by a barrier and <br />cover securely with a waterproof tarp. <br />7. Treat excavated soils as a hazardous waste unless the residue has been <br />tested and determined to be non -hazardous. <br />8. Try to prevent water runoff from leaving the facility or from entering a <br />water body. <br />a. Use existing runoff control measures if appropriate. <br />b. If feasible, check with the local sanitation district for discharge <br />requirements or divert flow to a sanitary sewer system. <br />c. Contain water runoff in leak -proof containers or storage tanks. <br />ME <br />
The URL can be used to link to this page
Your browser does not support the video tag.