Laserfiche WebLink
JA �*KNOLOG VacuTectTm TEST REPORT <br /> -� S.O. # <br /> TECHNOLOGY FOR TANKS <br /> TND T.HEIR ENVIRONMENT <br /> Date <br /> Owner SADDLL: i TY CHEVRON Site # <br /> r Phone <br /> Invoice Name/Address :" 1';DLE CITY CHEVRON 6421 PADDOCK: PLACE LCILI , CA• � <br /> Site Name/Address :ADDLE CITY CHEVRON 6421 PADDOCK PLACE LODI , Cry Attn: <br /> TANKS LINES Leak Det <br /> See Ullage TANKS and LINES Tested to CFR-40 Parts <br /> Diag. Tank Dipped Dipped Probe Water Bubble Air Line Final Exist 280-281 &NFPA 329 Spec's. <br /> For Dia.& Water Product Water Ingress Ingress Ingress TANK Line Delivery LINE LINE Leak LINE LD(s) NEW <br /> C. Material Level Level Level Detected Detected Detected ■ Material Syst.Type TEST TEST Rate ■ Pass/ LD(s) <br /> ST/ ■ ■ ■ ■ ■ ■ Tight ■ ■ ■ ■ ■ Tight Fail/ Tested Other: <br /> rank Tank Tank FRP/ START START START or ST/ START END or or & <br /> # Product Capacity Lined END END END Yes/No Yes/No Yes/No Fail Line# FRP PS/SS/GS TIME TIME GPH Fail NONE PASS <br /> Diameter Exist LD SN/MDL/MFG <br /> - New/2nd LD SN/MDL/MFG: <br /> Material Percent of Fill at PUmp LINE TEST PSI <br /> Start Time: - Time of Test: Mfg: -- <br /> ankro a Inclinometer Dispenser Shear valves <br /> End Time: - - Test PSI: - Entry: - Decrees o este esmo <br /> Diameter <br /> Exist LD SN/MOL/MFG: <br /> New/2nd LD SN/MDL/MFG: <br /> -Material Trencent of Fill atUmp LINE TEST PSI <br /> Start Time: Time of Test: Mf .. - <br /> ank Probe Inclinometer Dispenser Shear Valves <br /> End Time: Test PSI: Entry: De rees: - _ Operate esmo <br /> lameter - y I Exist LD SN/MDL/MFG: <br /> New/2nd LD SN/MDL/MFG: <br /> aterl8l ercent O I at Ump LINE TEST PSI <br /> Start Time: Time of Test: Mf .. ' <br /> End Time: T Test P I: - - Probe pc momearees:eter Dispenser Shear vales <br /> Operate es/no <br /> Diameter- .. .. - Exist LD SN/MDL/MFG: <br /> New/2nd LD SN/MDL/MFG: <br /> Material ercent O III at —rump LINE TEST PSI <br /> Start Time: Time of Test: Mfg.: - <br /> TanK Pro a Inclinometer Dispenser Shear valves <br /> End Time: Te <br /> st EntryDecrees; O erate es/no <br /> Diameter _ Exist LD SN/MDL/MFG: <br /> New/2nd LDSN/MDL/MFG: <br /> aterIa t ump LINE TEST PSI' <br /> Start Time: Mf .. <br /> ro a nc Inometer Dispenser Shear valves <br /> En Time: Entry: - D r s I Operate es/no <br /> Diameter <br /> Exist LD SN/MDL/MFG: <br /> New/2nd LD SN/MDL/MFG: <br /> stens ercent of Fillat T.-P <br /> LINE TEST PSI. <br /> Start Time: Time of Test: <br /> ank ro a nc mometer Dispenser Shear valves <br /> End Time: t PSI: <br /> Entr : D r Operate(yes/no) <br /> Tanknology Corporation International <br /> TANKNOLOGY Region: WESTERN REGION Unit # State Lic. # State: 5225 Hollister St., Houston, TX 77040 <br /> NOTE: Original VacuTect Data recordings are reviewed by Tanknology's Audit Control Department and maintained on file. (800) 888-8563 • FAX (713) 690-2255 <br /> TAK-01 <br />