Laserfiche WebLink
SWRCB, MAY 2002 Page (.- of <br /> 7. UNDER-DISPENSER CONTAINMENT (UDC) TESTING <br /> Test Method Developed by: Q UDC Manufacturer Q Industry Standard Q Professional Engineer <br /> Q Other(Specify) <br /> Test Method Vacuum Q Hydrostatic <br /> (/ Q Oth,r'Specify) <br /> Test Equipment Used: VMI A Equipment Resolution: .05 9ph <br /> UDC# -/p UDC# /,2, UDC# UDC# <br /> UDC Manufacturer: c .6 <br /> UDC Materials: P401p <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical-Penetration: Z �' <br /> Condition of UDC prior to testing: per. O� <br /> Portion of UDC Tested: AY i" ALL ALL ALL <br /> Does turbine shut down when UDC <br /> sensor detects either product or water? r <br /> Turbine shutdown response time: <br /> Is system programmed for <br /> fail-safe shutdown? <br /> Was fail-safe verified to be <br /> operational? -- <br /> Wait time between applying pressure/ <br /> vacuum/water&starting test: 71S sg► 15~7S <br /> Test Start Time: <br /> Initial Reading(R.) <br /> Test End Time: III31e //3 <br /> Final Reading(RF): bep~ 9,9 0 <br /> Test Duration: V- y T s <br /> Change in Reading(RF-R,): d>-0 O o� <br /> Pass/Fail Threshold or Criteria: C7SC/J`J <br /> TEST RESUL1% PASS Q FAIL Q PASS X FAIL Q PASS Q FAIL Q PASS Q FAIL <br /> Was sensor removed for testing? oYesoNoONA ❑Yes Q No Q NA ❑Yes Q No Q NA Q Yes Q No Q NA <br /> Was sensor properly replaced& <br /> verified functional after testing? Yes Q No Q NA Q Yes C3No Q NA Q Yes Q No Q NA Q Yes Q No Q NA <br /> Comments—(include information on repairs made prior to resting, and recommended follow-up for failed tests) <br />