My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1995 - 2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
COMPLIANCE INFO 1995 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 11:14:19 AM
Creation date
4/10/2019 2:22:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995 - 2002
RECORD_ID
PR0231706
PE
2361
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
01
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC. HEALTH SEIMCES <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DIVISION <br /> Karen Furst, M.D., M.P.H., Health Officer �P <br /> 304 East Weber Avenue,Third Floor • Stockton, CA 95202 <br /> 209/468-3420 <br /> CONDITIONS OF APPROVAL <br /> Site information: Flag City Chevron, 6421 Capitol Ave, Lodi, Ca. <br /> Your application for permit to install under-dispenser containment and sensor has been <br /> approved with the following conditions: <br /> 1. Contact fire department for permit. <br /> 2. A soil sample is to be collected and analyzed as indicated in the attached minimum <br /> verification laboratory analysis. Analytical result shall be submitted to <br /> Environmental Health Division (EHD). <br /> 3. Submit sampler and laboratory information to EHD for approval prior to commencing <br /> work and/or scheduling any inspection appointment. <br /> 4. Contact EHD for the following inspections: <br /> a. Soil sampling below each dispenser. <br /> b. Pressure test on primary and secondary lines. <br /> c. 24-hour lake test. <br /> d. Final inspection. <br /> 5. All lines shall be precision-tested by a licensed tank tester. Result is to be submitted <br /> to EHD prior to placing the tank system in service. <br /> 6. Submit As-Built plan to EHD prior to scheduling final inspection. <br /> 7. If automatic pump shutdown is provided it must satisfy all conditions listed in section <br /> 2636(g) of California Code of Regulation. <br /> 8. Any changes in information provided to EHD must be submitted to EHD for approval <br /> prior to commencing work. <br /> 9. Depending on the outcome of the field inspection, permit(s) to install and to remove <br /> piping may be required. <br /> 10. Permit expires on 10/2/01. <br /> If you shall have any questions please contact me at 209-468-3444. <br /> _00�A/ <br /> L <br /> � V % <br /> ichael Kith, Sr. REHS <br /> San Joaquin County <br /> Environmental Health Division <br /> A Division of San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.