Laserfiche WebLink
SWRCB, January 2002 <br />6. PIPING RI IMP TFCT1N1'_ <br />Page 5 of <br />Test Method Developed By: ❑ Sump Manufacturer ❑ Industry Standardrofessional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum drostatic <br />❑ Other (Specie) <br />Test Equipment Used: ("it l �y; �'I rr,r'? , �!' . t ., r.. ,�, - _1, .� 4 ,� t ,, <br />:�'f' Equipment Resolution: <br />Sump # <br />Sump # <br />Sump # <br />ump # <br />Sump Diameter: <br />A �%etrt}.Suba <br />Sump Depth: <br />3 v, <br />Sump Material: <br />Coo JPd `a 4 t L <br />Height from Tank Top to Top of <br />l l <br />Highest Piping Penetration: <br />E' <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />ID Y <br />/ <br />Portion of Sump Tested' <br />i&4+ey L&At'l r <br />Does turbine shut down when <br />r <br />sump sensor detects liquid (both <br />❑Yes �No ❑ NA <br />❑ Yes } ❑ No ❑ NA <br />[I Yes �Do ❑ NA <br />❑ Yes ❑ o ❑ NA <br />product and water)?* <br />; <br />Turbine shutdown response time <br />IJ A-- <br />� <br />Is system programmed for fail-safe <br />11 Yes ❑ NoA <br />❑ YJs No ❑ NA <br />❑ Yes f-1;No <br />shutdown?' <br />✓ <br />❑ NA <br />11 Yes No ❑ NA <br />Was fail-safe verified to be <br />❑ Yes ❑ No LXNA <br />❑ Yes No <br />1 <br />operational?* <br />❑ NA <br />❑ Yes . ❑ No ❑ NA <br />❑ Yes ii To ❑ NA <br />1 <br />Wait time between, mg <br />++ <br />pressure/vacuum/water, d starting <br />f <br />test: <br />in«a. 5 <br />I O <br />Test Start Time: <br />a <br />Initial Reading (RI): <br />Test End Time: <br />lo r qd <br />1 <br />t <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF -R,): <br />IVIG 6 1� 41 <br />4 <br />1 <br />Pass/Fail Threshold or Criteria: <br />0 p 5 30 <br />Test Result: <br />A"Pass ❑ Fail <br />Cl Pass ❑ Fail <br />❑ Pass ❑ Fail <br />D Pass ❑ Fail <br />Was sensor removed for testin g? <br />es ❑ No ❑ NA <br />$ <br />[ Yes ❑ Ntt � ❑ NA <br />' ❑ Yes ❑ No C1NA <br />i <br />U Yes ❑ No ❑ NA <br />I❑Yes <br />Was sensor properly replaced and <br />es ❑ No 11NA <br />' <br />verified functional after testing? <br />❑Yes ❑No ❑ NA <br />❑Yes E No [INA <br />❑ No ENA <br />Comments — (include information on repairs made prior to testing and recommended ollow-upforfailed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to a_y of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />