Laserfiche WebLink
Mon0cring System Certification <br />Site Address: //I— auCG�j�, .arf� �- <br />T �_ Dateof'I'esting/Servicing. (5 <br />F. In -Tank Gauging /SIR Equipment: Q"C'(ieck this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -lank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />❑ Yes <br />❑ <br />No* <br />I Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />❑'Yes <br />❑ No* <br />❑ N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: ClT 'g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />❑ Yes <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ No* <br />Was the testing apparatus properly calibrated? <br />2rVes <br />❑ No* <br />❑ N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ Yes <br />❑ No* <br />❑�1%A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ Yes <br />❑ No* <br />p"'? /A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />or disconnected? <br />❑ Yes <br />❑ No* <br />3-,g q <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />malfunctions or fails a test? <br />❑ Yes <br />❑�p*- <br />LSI N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />O'Yes <br />❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />III ane 3ecnon n, oeiow, aescrIne now and when these deficiencies were or will be corrected. <br />H. Comments: F`? f <br />� t +E' 4L% ✓�/ <br />k9 <br />t�T <br />t �' ,1`. ` . <br />� i"'O S �fy p <br />-t"0 �OP car 'O'—D <br />h /- <br />Page 3 of 3 05/00 <br />