Laserfiche WebLink
SWRCB, January 2002 / Page of <br />SECONDARY PIPE TESTING <br />Test Method Developed By r Piping .Manufacturer C dustry Standard =Professional Engineer <br />- (Spec;!!) <br />Test Method Used: vressure Vacuum El Hydrostatic <br />El Other (Specify) <br />Test Equipment Used: <br />Piping Run # Piping Run # <br />Piping Material: G ,� <br />! Equipment Resohrtion: <br />Piping Run # Piping Run # <br />Piping Manufacturer <br />1-4 <br />1j <br />Piping : <br />�� <br />% <br />3 <br />4 3 <br />Length of Piping Run: <br />j <br />la - <br />7 -Product Stored: <br />Method anti location of <br />piping -,-Lm isolation: <br />..S' rj0 f,v <br />Wait tont between applying <br />pressure/vacuum/water and <br />starting test: <br />O) Y-;4,( ^ <br />j <br />/Q � <br />/d `✓! "y <br />1 <br /><d i'7 h <br />Test Start Time: <br />Initial Reading (Rt): <br />L ,BS <br />QS <br />G <br />Test End Time <br />iQ dd <br />' d a <br />is 3d <br />Fatal Reading (RF): <br />f L <br />Test Duration:A <br />Change in Reading (R£-U:— <br />Pass/Fail Threshold or <br />Criteria: <br />/l0 <br />DY <br />Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />