Laserfiche WebLink
ENVIRONMENTAL HEALTH DEPARTMENT <br />P(]. ! N <br />.c <br />Q. ?, Donna K. Heran, R.E.H.S. <br />U):Director <br />Al Olsen, R.E.H.S. <br />Program Manager <br />i F o a Laurie A. Cotulla, R.E.H.S. <br />Program Manager <br />April 16, 2003 <br />SAN JOAQUIN COUNTY <br />304 East Weber Avenue, Third Floor <br />Stockton, California 95202-2708 <br />Telephone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />Wendt & Son's Construction, Inc. <br />P.O. Box 1403 <br />Lodi, CA 95241 <br />Unit Supervisors <br />Carl Borgman, R.E.H.S. <br />Mike Huggins, R.E.H.S., R.D.I. <br />Douglas W. Wilson, R.E.H.S. <br />Margaret Lagorio, R.E.H.S. <br />Robert McClellon, R.E.H.S. <br />Mark Barcellos, R.E.H.S. <br />RE: Flag City Chevron: 6421 Capitol Avenue, Lodi California <br />Your application for permit to install new piping, under dispenser containment, spill buckets and <br />tank trims at the above location has been approved with the following conditions: <br />1. Contact the local fire department and the San Joaquin Valley Air Pollution Control District <br />for applicable permits. <br />2. Any changes shall be submitted to EHD for approval prior to commencing work. All new <br />submittals supercede the previous ones. <br />3. Both primary and secondary pipes shall bear a UL label. <br />4. All pipe fittings and connections shall bear a UL label. <br />5. All monitoring systems shall be listed on the LG113-16. <br />6. All testing shall be in compliance with manufacturer's instruction, section 2635 and section <br />2636 of California Code of Regulations (CCR). Automatic pump shutdown must satisfy CCR <br />2636(g). <br />7. All piping must slope to a containment sump with an audible/visual alarm. <br />8. All equipment in contact with backfill must be corrosion protected. <br />9. Contact EHD for the following inspections: <br />a. Witness soil sampling <br />b. Primary and Secondary piping <br />c. 24 hour lake test on dispenser pans and sumps <br />d. Final inspection <br />10. Overfill prevention must satisfy CCR 2635(b)(2). <br />11. An accurate and drawn -to scale -as -built plan must be submitted to EHD prior to the final <br />inspection. <br />12. A complete monitoring and response plan must be submitted prior to the final inspection. <br />13. All lines and tanks shall be tested for tightness (once the facility is in operating conditiong), <br />in accordance to manufacturer's guidelines by a licensed tank tester and results received <br />prior to the final inspection. <br />14. Contact Dennis Catanyag, REHS at (209) 468-3459 for inspections. See inspection <br />checklist for the required inspections. <br />15. All inspection appointments must be scheduled 48 hours in advance. <br />16. This permit expires on July 16, 2003. <br />Thank you, <br />- C <br />Dennis H. at g, REHS <br />Registered Environmental Health Specialist <br />