My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
COMPLIANCE INFO 2009 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 11:57:34 AM
Creation date
4/10/2019 3:28:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2013
RECORD_ID
PR0231706
PE
2361
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
01
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gauging I SIR Equipment; X Check this box If tank gauging Is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />` This section must be completed if in -tank gauging equipment Is used to perform leak detection monitoring. <br />Complete the fonowin g checklist: <br />Yes Q No` Has all Input wiring bean inspected for proper entry and termination, iticluding testing for ground faults? <br />❑ Yes 0 No* are all tank gauging probes visually inspected for damage and residue bulldun? <br />a Yes C7 Now Was a .curacy of system product level readings tested? <br />Q Yes ❑ Na" Was accuracy of system water level readings tested? <br />Q Yes i.7 No" Were all probes reinstalled properly? <br />❑ Yes p No Ware all items on the equipment manufacturer's maintenance checklist cornpleted7 <br />In the Section M, below, describe how and Whan these deficienclp$ were or tiMI bo corrected. <br />G. Line Leak Detectors (LLD); Q Check this box if LLDs are not installed. <br />D No" For equlpmollt start-c;p or annual equipment certifiication, was a leaksimulated to <br />Q N/A that apply) Simulated loatc rate; X 3 g.p,h.; Il 0.1 g,p.h ; ❑ 0,2 g.p.h. <br />Q Na' Were all LLDa confirmed operational and accurate wltninregulatory requirements; <br />Q No" Was the testing apparatus properly calibrated? <br />❑ No` For mechanical LLDs, does the LLD restrict product flow if it dateel a leak? <br />Q NIA <br />1i No" For electronfo LL[7s, does the turbine automatically shut off if the LLD detects a les <br />V nun <br />Q Yes q No" For 0 actronio LLD$, does the turbine automatically shut off If eny portion of the Monitoring system is disable <br />X NIA disconnected? <br />Q Yes u I For electronlc t.LQs, does the turbine autornatically shut aff if any portion of the monitoring system malfunctions or <br />X NIA a test? <br />❑ Yes © Ne For electronic Ill have all accessible wiring connections been visually inspected? <br />X NIA <br />X Yes 11 Ne" Were ail items on the equipment manufacturers maintenance checklist completed? <br />In the Section H, below, d4tscrtbe how And when thew tieficiencfe$ were or will be corrected. <br />H. Comments: <br />Monitoring system certification Page 3 of 4 <br />12107 <br />3 <br />or <br />2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.