My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
COMPLIANCE INFO_2014 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 2:30:29 PM
Creation date
4/10/2019 4:46:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014 - 2018
RECORD_ID
PR0231706
PE
2361
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
01
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REU:I,VtLy <br /> FEB 0 S 2016 <br /> SWRCB,January 2002 Paye f <br /> 5. SECONDARY PIPE TESTING ENVfiRl1t]TAL <br /> Test Method Developed By: X Piping Manufacturer I Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run# 1 Piping Run#2 Piping Run#3 Piping Run#4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 3" 3" 4" 3" <br /> Length of Piping Run: Approx. 195' Approx.210' Approx.25' Approx. 105' <br /> Product Stored: Super 91 Regular 87 Master Regular 87 Siphon Diesel <br /> Method and location of Clam Shell Test Port Clam Shell Test Port Clam Shell Test Port Clam Shell Test Port <br /> piping-run isolation: at Piping Sump#1 at Piping Sump#2 at Piping Sump#2 at Piping Sump#4 <br /> Wait time between applying 10 Minutes 10 Minutes 10 Minutes 10 Minutes <br /> pressure and starting test: <br /> Test Start Time: 9:15 9:25 9:05 9:10 <br /> Initial Reading(Rj): 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time: 10:15 10:25 10:05 10:10 <br /> Final Reading(RF): 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-RI): 0 Psi 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No detectable loss No detectable loss No detectable loss No detectable loss <br /> Criteria: <br /> Test Result: Pass Pass Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-aip.for.failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.